WATER AND ELECTRICITY INSTALLATION INSTRUCTION FOR ALL MODELS
(1) Water: Two water lines for cold and hot water respectively ½-inch National Pipe Thread (NPT).
(2) Power
:
Power requirement: Single-phase three-wire 220V power supply.
TECHNICAL INFORMATION
•
Materials
: Tempered Glass
•
Power Supply
: 3KW 20amp, 220V
•
Steam Ready
: 2-5 MIN
ELECTRICAL INFORMATION
•
1 dedicated 12-2 line for steam (line 1, line 2, and ground)
•
Single-phase three-wire 220 volt, 20 amp GFCI breaker
•
The length of the wire for the machine is 1.5m (adjustable); it can be changed to a suitable length.
•
Connect the overhead light, speaker, fan, CD, telephone according to the tags on the wires.
•
Do not connect the wire “O3” to anything.
•
Connect main power supply.
PLUMBING INFORMATION
•
The unit is equipped with 3 ft. hot and cold, metal braided water supply hose with ½-inch national pipe thread to connect from
faucet/manifold (Manifold is located. 4 ft. high on rear of unit) to the shutoff valves (should be installed where they can be
accessed). Note: base edge sets directly against back and sidewall. Do not install any pipes along walls as to impede the
base from setting flush against them..
•
Install hot and cold shutoffs with ½ -inch male national pipe thread (not included). Install shutoffs where they can be
accessible.
•
Access panel near controls, pumps, and jets is recommended
•
Drainage: It is advised to have base onsite before preparing drain location. The diameter of the drain hole should be larger or
equal to Φ40mm (1.6 inches).
•
Note:
The flexible drain hose included with this unit is for installation into a floor drain only.
Substituting the existing drain setup for a setup of the installers’ choice will not void the warranty of
the unit as long as there is no evidence of misuse or damage to the base..
•
All fixtures and fittings must be checked for tightness as they may have been loosened during transport
GENERAL INFORMATION
•
Connect hot and cold supplies and make all electrical connections just before unit is set into place.
•
Units come broken down in panels and are assembled with screws, nuts and bolts on site.
•
This unit assembles from the inside for convenience.
•
Note
: All shower bases are a man made stone composite and may need to be set in mortar for leveling
purposes.
•
It is advised to have base onsite before preparing drain location
•
Access panel area recommended
•
Manufacturer reserves the right to change specs or
features at anytime. Please check to confirm details.
1-866-783-2661
Caulk all needed seams and joints with 100% silicone caulk.
DRAIN INSTALLATION FOR ALL MODELS
For glass steam room and shower room with 150mm shower tray:
A: Glass A
B: Steam Generator Drain
C: Shower Drain
D: Shower tray