Star VBE30 Скачать руководство пользователя страница 5

5

INSTALLATION INSTRUCTIONS

UNCRATING AND INSPECTING

Unpack the unit and components from the shipping container.  Remove all visible packing 

material and those from inside the cooking chamber. If damage is discovered, file a claim 

immediately with the carrier that handled the shipment. Do not operate the unit if it was 

damaged during shipping.

ASSEMBLY AND INSTALLATION

The unit was shipped fully assembled and ready to plug into a standard outlet specified for 

its voltage and amp draw. If improper electrical supply is determined, contact a qualified 

electrician prior to using the unit. Removal and replacement of the power cord and plug will 

void the warranty.  For assistance, contact your local authorized service agent for service or 

required maintenance. 
Place unit on a level surface.
This broiler can be very hot during operation.  Use care when carving the mead during use.
Allow enough space around the unit for adequate ventilation.  Read all labels on the unit and 

follow their instructions.

VENTILATION & CLEARANCES

Local codes prevail. These are the “authority having jurisdiction” as stated by the National Fire 

Protection Association, Inc. in NFPA 96-Latest Edition. For further ventilation information see 

below.  
A ventilation hood should be used to remove heat and cooking odors. The hood and HVAC 

installation must meet local codes to gain approval by the authority having jurisdiction.  

Requirements may vary throughout the country depending on the location by city, county, and 

state. Obtain information from the authority having jurisdiction to determine the requirements 

for your installation. Obtain information and review copies of codes or documents that will 

be used to inspect and approve your installation.  Your ventilation hood supplier and HVAC 

contractor should be contacted to provide guidance.

ELECTRIC MODEL

The broilers are equipped for the voltage indicated on the nameplate mounted on the unit.  

They will operate on alternating current (AC) only.  Before making any electrical connection to 

this unit, check that the power supply is adequate for the voltage, amperage and requirements 

stated on the nameplate.
Disconnect the unit from the power source before installing or removing any parts.

Be absolutely sure that the ground connection for the receptacle is properly wired. Do not 

connect equipment to power without proper ground connections. Improper grounding may 

result in personal injury or fatality.

Before making any electrical connection be sure to read the data plate located on 

the unit.

CONNECT/PLUG UNIT INTO DEDICATED A.C. LINE ONLY SPECIFIED ON THE DATA 

PLATE OF THE UNIT.

WARNING

WARNING

CLEARANCES

Combustible 

Construction

Non-Combustible 

Construction

Floor

0”

0”

Sides

12”

Back

3”

Содержание VBE30

Страница 1: ...any other appliance WARNING This appliance shall be installed in accordance with current regulations and used only in well ventilated space Refer to instructions before installing and using this appl...

Страница 2: ...or errors or omissions in information provided or conclusions provided the user assumes all risks in connection with such use MAINTENANCE AND REPAIRS Contact your local authorized service agent for se...

Страница 3: ...ut BTU s KW Total Amps Plug Type Aproximate Weight Shipping Installed VBE30 16 08 24 97 32 208V 4 5 21 6 NEMA 6 30P 60 70 230V 4 2 18 2 240V 4 5 18 8 NEMA 6 30P VBG30 40 79 63 42 81 28 120V NAT 30 000...

Страница 4: ...ES WHERE APPLICABLE NOTICE For your protection we recommend a qualified installing agency install this appliance They should be familiar with gas installations and your local gas requirements In any c...

Страница 5: ...remove heat and cooking odors The hood and HVAC installation must meet local codes to gain approval by the authority having jurisdiction Requirements may vary throughout the country depending on the l...

Страница 6: ...hutoff valve must be disconnected from the gas supply piping system during any pressure testing of that system at test pressure in excess of PSIG This appliance and its individual manual shutoff valve...

Страница 7: ...ockwise for the section to a position of ON or close to it For holding or finishing turn the valves closer to the LO position on the dial You select the heat pattern you like and set the valves accord...

Страница 8: ...orized service agency Star will not be responsible for charges incurred or service performed by non authorized repair agencies In all cases the nearest Star authorized service agency must be used Star...

Страница 9: ...12 11 8 13 14 ELECTRIC BROILER WIRING DIAGRAM Z13920 PILOT LAMP TERMINAL BLOCK SEE NAMEPLATE FOR VOLTAGE SUPPLY WIRES FOR SUPPLY USE COPPER CONDUCTORS RATED FOR 75 C MINIMUM POWER CORD WHT BLK GRN TER...

Страница 10: ...al to Star Manufacturing International Inc No reproduction or disclosure of it s CERTAIN INSTANCES MAY NOT BE AVAILABLE ILLUSTRATIVE PURPOSES ONLY AND IN SOME ITEMS ARE INCLUDED FOR contents is permit...

Страница 11: ...COLLAR MOTOR 1 11 K8 Z13908 MOTOR SUPPORT BRACKET 1 12 2P Z13918 RETURN SPRING 1 13 K8 Z13912 SLIDE SUPPORT BRACKET 2 14 2U Z13886 MOTOR 208 240V 1 16 2E 30900 15 FUSE 3 AMP AGC 2 17 2E 30901 02 FUS...

Страница 12: ...12 MODEL VBG Gas Vertical Broiler SK2567 Rev A 12 17 2014 1 7 9 12 13 14 15 27 28 29 30 31 32 33 34 35 36 37 16 25 20 17 21 22 23 24 19 18 2 26 2 10 38 39 11 40 41 6 8 2 3 2 5 4...

Страница 13: ...RAIL BRACKET 19 K8 Z13908 1 MOTOR SUPPORT BRACKET 20 2A Z13899 1 DRIVE COLLAR MOTOR 21 2C Z13887 1 SHOULDER SCREW 8X32 TH 22 K8 Z13910 1 MOTOR PULL BAR 23 2I Z14377 1 END CAP FLAT GRIP 3 4 24 2P Z1391...

Страница 14: ...14...

Страница 15: ...15...

Страница 16: ...16 STAR MANUFACTURING INTERNATIONAL INC Star Holman Lang Wells Toastmaster 265 HOBSON ST SMITHVILLE TN 37166 800 264 7827 www star mfg com...

Отзывы: