11
PULLEY LAT
INSTALLATION
NOTE:
take special care when unwrapping unit,
DO NOT
use knifes to cut open packaging damage may
occur.
STEPS
:
1. Take main body off the pallet and place it on the floor.
2. Attach the upper arms to the main body.
(note: cables are attached, take special care not to pinch, twist, or damage cables. Make sure
the cables travel straight).
Use (6) m12 washers, (2) m12 locking nuts and (6) M12 x 30 button head screws to attach arms to
the main body, tighten fasteners to ( 84 NM / 62 ft-lb ) torque.
3. Take the knee pad assembly; remove M6 Phillips head screw and washer.
Slide knee pad assembly into main body; re-install M6 Phillips screw and washer.
4. Attach accessories to the unit.
5. Place urethane boots under feet.