5
7
6
5 HOLE DRILLING
Remove template. Drill holes on Door Markings (5A) as shown on template. Refer to template for hole size dimensions.
INSTALLATION
7 EXIT DEVICE INSTALLATION
Remove Cover (7A) from Exit Device (7B). Place Exit Device (7B) onto Door (7C) keeping it horizontally level and aligning mounting holes with holes drilled. If you have an exterior trim that
has an actuating shaft or a tailpiece, you must allow shaft or tailpiece to align inside the Cam (7D) of Exit Device (7B). Mount Exit Device (7B) with appropriate Screws (7E), either by engaging
with exterior trim or securing directly onto Door (7C).
6 HANDLING DEVICE SETTING
This Device (6A) is factory set for a LHR door use. For a RHR door use, rotate the device 180° as shown. Change Setting Screw (6C) to upper position and change Holding Screw (6D)
JAMB
VERTICAL
CENTER LINE
HORIZONTAL
CENTER LINE
FLOOR
SIDE JAMB
CHASSIS
PUSH BAR
HORIZONTAL
CENTER LINE
VERTICAL
CENTER LINE
DOOR
5A
5A
5A
5A
7A
7B
7B
7B
7C
7D
7E
7E
6B
6A
6D
6C
LHR DOOR HANDLING
FACTORY SET
RHR DOOR HANDLING
SET AT INSTALLATION
4 / 20
6A
6D
6C
6B
to upper hole position.