Standard Pump SPFP30NPS Скачать руководство пользователя страница 15

EC / EU DECLARATION OF CONFORMITY

The objective of the declaration described is in conformity with the relevant Union harmonisation legislation: 

Directive 94/9/EC (until April 19, 2016) and Directive 2014/34/EU ( from April 20, 2016).

Date of Issue: 

10 May 2014

Technical File No.:  

203104000-1410/MER

Quality System Registration No: 

ISO 9001-2000

Conforming Apparatus: 

Air-Operated Metal

 

Double Diaphragm Pumps for Use In Potentially

 

Explosive Atmospheres

Hazardous Location Applied: 

II 2 G c T5

 

II 2 D c T100°C 

 

T5 fluids up to 95° C

Manufacturer: 

Standard Pump, Inc.

 

1610 Satellite Blvd., Suite D

 

Duluth, GA 30097

 USA

On File With: 

DEKRA Certification B.V. (0344)

 

Meander 1051

 

6825 MJ Arnhem

 

The Netherlands  

Harmonized Standards Applied: 

BS EN 13463-1:2009 Non-Electrical Equipment 

 

Potentially Explosive Atmospheres-Part 1 Basic 

 

Methods and Requirements  

 

EN 13463-5:2011 Non-Electrical Equipment for 

 

Potentially Explosive Atmospheres-Part 5 

 

Protection by Constructional Safety 

Equipment:       

SPFP20, SPFP30, SPSN20, SPFP15, SPSN15 

We hereby certify that the above apparatuses described above conforms with the protection 

requirements of Council Directive 94/9/EC of 23 March 1994 Annex VIII on the approximation of

 

the laws of the Member States Concerning Equipment and Protective Systems Intended for use 

in Potentially Explosive Atmospheres

DATE/OF REVISION/TITLE: 

Chris Murphy

24 March 2016 

Director of Operations

Содержание SPFP30NPS

Страница 1: ...FP30NPS SPFP30SSS SPFP30SST STANDARD PUMP INC 1610 Satellite Blvd Suite D Duluth Ga 30097 Phone 770 307 1003 www standardpump com 3 Food Processing Service Operating Manual 1 PUMP SPECS 2 INSTAL OP 3...

Страница 2: ...uses Before pump operation inspect all fasteners for loosening caused by gasket creep Retighten loose fasteners to prevent leakage Follow recommended torques stated in this manual CAUTION WARNING Nonm...

Страница 3: ...eration Typical Installation Guide Troubleshooting SECTION 3 EXPLODED VIEW 7 Composite Drawings Parts List Materials Code SECTION 4 CERTIFICATES 11 EC Declaration of Conformity Directive 2006 42 EC Ma...

Страница 4: ...lt in deviations in excess of 5 NOTE Performance based on the following PTFE fitted pump flooded suction water at ambient conditions The use of other materials and varying hydraulic conditions may res...

Страница 5: ...ifluoride or oxygen difluoride which readily liberate free fluorine at elevated temperatures 220 F 104 C 35 F 37 C Maximum and Minimum Temperatures are the limits for which these materials can be oper...

Страница 6: ...LAMP DISCHARGE FLANGE 3 57 O D TRI CLAMP SUCTION FLANGE 1 2 NPT AIR INLET 1 NPT AIR EXHAUST 32 01 813 05 16 96 430 66 3 46 87 96 40 10 16 NOTES 1 THE DIMENSIONS ON THIS DRAWING ARE FOR REFERENCE ONLY...

Страница 7: ...suction piping and across the suction side check valve and into the outer fluid chamber Suction side stroking also initiates the reciprocating shifting stroking or cycling action of the pump The sucti...

Страница 8: ...ter in the air supply can be reduced by using a point of use air dryer Air Inlet And Priming To start the pump slightly open the air shut off valve After the pump primes the air valve can be opened to...

Страница 9: ...lds to allow proper air flow Deadhead system pressure meets or exceeds air supply pressure Increase the inlet air pressure to the pump Pump is designed for 1 1 pressure ratio at zero flow Does not app...

Страница 10: ...4 25 26 27 29 30 31 32 33 34 37 38 39 35 36 40 41 41 39 40 28 11 REV REVISION CHG DATE APP DATE ECN THIS IS A PROPRIETARY DOCUMENT DO NOT REPRODUCE OR DISCLOSE WITHOUT THE EXPRESS WRITTEN PERMISSION O...

Страница 11: ...200 211 200 320 200 433 200 437 15 2 Air Chamber Gasket 16 8 Bolt 200 327 200 232 200 223 200 227 200 239 200 221 200 217 17 1 Pilot Sleeve Assembly include item 18 18 6 O ring 19 1 Retaining Ring 20...

Страница 12: ...OPRIETARY DOCUMENT DO NOT REPRODUCE OR DISCLOSE WITHOUT THE EXPRESS WRITTEN PERMISSION OF WARREN RUPP INC DESCRIPTION DRAWING NUMBER WARREN RUPP INC REV 01 E3Sx5xxx0C FP ATEX E3 FP PTFE FITTED PUMP To...

Страница 13: ...ir Chamber 200 211 200 320 200 433 200 437 15 2 Air Chamber Gasket 16 8 Bolt 200 331 200 232 200 223 200 227 200 242 200 221 200 217 17 1 Pilot Sleeve Assembly Include item 18 18 6 O ring 19 1 Retaini...

Страница 14: ...TUNG DER VORSCHRIFTEN DICHIARAZIONE DI CONFORMIT CONFORMITEITSVERKLARING DEKLARATION OM VERENSST MMELSE EF OVERENSSTEMMELSESERKL RING VAATIMUSTENMUKAISUUSVAKUUTUS SAMSVARSERKL RING DECLARA AO DE CONFO...

Страница 15: ...7 USA On File With DEKRA Certification B V 0344 Meander 1051 6825 MJ Arnhem The Netherlands Harmonized Standards Applied BS EN 13463 1 2009 Non Electrical Equipment Potentially Explosive Atmospheres P...

Страница 16: ...d Contact Materials Signature of authorized person Revision Level B Printed name of authorized person Chris Murphy Director of Operations October 13 2015 Date of issue September 11 2013 Title Date of...

Отзывы: