Stancor SEW Series Скачать руководство пользователя страница 11

11 

 

Disassembly and Assembly 

1. 

Disassembly- 

When disassembling pump, have a piece of cardboard or wooden board ready to place the different parts on as 

you work. Do not pile parts on top of each other. 

They should be laid out neatly in rows. The “O” ring and gasket 

cannot be used again 

once they are removed. Have replacement parts ready. Disassemble in the following order, referring to the 

sectional view. 

Be sure to cut off power source before disassembly. 

(1) 

Remove pump casing bolts, raise the motor section and remove pump casing. 

(2) 

Remove shaft head bolt and impeller. 

(3) 

Remove oil filler plug and drain lubricating oil. 

(4) 

Remove intermediate casing bolts and oil chamber. 

(Remember that any lubricating oil remaining in the mechanical seal chamber will flow out.) 

(5) 

Carefully remove mechanical seal, beware of not to scratch sliding surface of motor shaft. 

 

2. 

Assembly- 

Re-assemble in reverse order of disassembly. 

Be careful of the following points. 

(a) 

During re-assembly, rotate the impeller by hand and check for smooth rota- tion. If rotation is not smooth, 

perform steps-(3) through -(5) again. 

(b) 

Upon completion of re-assembly step -(1) rotate the impeller by hand from the suction inlet and check that it 

rotates smoothly without touching the suction cover before operating the pump. 

 

Please order “O” rings, packing, shaft seals and other parts from your dealer. 

 

Nameplate format 

 

 

Содержание SEW Series

Страница 1: ...EI 700 006 REV 1 Installation Operation and Maintenance Manual Stancor SEW Series Pumps _______________________________________________________________________...

Страница 2: ...h the exception of shortening the cord to fit into a control panel Any splice between the pump and the control panel must be made within a junction box and mounted outside of the basin and comply with...

Страница 3: ...o during rainstorms water may be present in the surrounding area of the pump Caution must be used to prevent bodily injury when working near the pump Electrical power should be disconnected prior to t...

Страница 4: ...uring shipment Are any bolts or nuts loose Have all necessary accessories been supplied For a list of standard accessories see Construction We recommend that you keep a spare pump on hand in case of e...

Страница 5: ...op 6 Do not permit end of discharge piping to besubmerged as backflow will result when the pump is shut down 7 WARNING Non automatic pumps do not have an automatic operating system Do not operate the...

Страница 6: ...may be blocking the suction inlet 2 Regular inspections Monthly inspections Measure the insulation resistance The value should be more than 1M ohm If resistance starts to fall rapidly even with an ini...

Страница 7: ...7 Construction SEW DN 1 5 2HP...

Страница 8: ...200 11 Impeller FC 200 NO Name Mtrl NO Name Mtrl 1 Cable H07RN F SJTOW STOW 20 5 Washer SUS 304 13 Protector 3 Phase 20 7 Washer SUS 304 14 Capacitor 1 Phase 21 1 Spring Washer SUS 304 19 Screw SUS 30...

Страница 9: ...9 Construction SEW DN 3HP...

Страница 10: ...200 11 Impeller FC 200 NO Name Mtrl NO Name Mtrl 1 Cable H07RN F SJTOW STOW 20 5 Washer SUS 304 13 Protector 3 Phase 20 7 Washer SUS 304 14 Capacitor 1 Phase 21 1 Spring Washer SUS 304 19 Screw SUS 3...

Страница 11: ...filler plug and drain lubricating oil 4 Remove intermediate casing bolts and oil chamber Remember that any lubricating oil remaining in the mechanical seal chamber will flow out 5 Carefully remove mec...

Страница 12: ...ation 3 Correct rotation Does not pump Inadequate vol ume 1 Reverse rotation 1 Correct rotation see Operation 2 Significant drop in voltage 2 Contact electric power company 3 Operating a 60Hz pump wit...

Страница 13: ...Industrial Flow Solutions Operating LLC 104 John W Murphy Drive New Haven CT 06513 USA 860 399 5937 www flowsolutions com Stancor is a trademark of Industrial Flow Solutions Operating LLC All rights...

Отзывы: