ASSEMBLY INSTRUCTIONS
STEP 3
Insert the two
SUPPORT BARS(4)
between the
BASE FRAMES(1)
and the
LOWER UPRIGHTS(3),
then secure at top and bottom to the
BASE FRAMES(1)
and the
LOWER UPRIGHTS(3)
with
HEX
BOLTS(M8x1.25x70mm)(29), WASHERS(M8)(37),
and
NYLOCK NUTS(M8x1.25)(34).
STEP 4
Insert the two
UPPER UPRIGHTS(11)
into the
LOWER UPRIGHTS(3)
and secure with
HEX BOLTS
(M10x1.5x65mm)(32), WASHERS(M10)(38),
and
NYLOCK NUTS(M10x1.5)(35).
STEP 5
Attach the
PULL-UP BAR(12)
to both the
UPPER UPRIGHTS(11)
with
HEX BOLTS(M10x1.5x45mm)(31)
and
ARC WASHERS(M10)(36).
8
Содержание 1700 Power Tower
Страница 16: ...PRODUCT PARTS DRAWING 16 BACK FRONT...