224618 / FL6S60300010
2018-05-24·BA00·III·en·02
Mounting and installation
11
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
GRP Flameproof Visual Signal - 5 Joule
Series FL6S
7.2.2 Installation with mounting bracket
• Loosen 6 x cheese head screws (6) and remove strobe flange (5)
• Prepare cable gland
• Ensure earth connection
• Install cable gland
• Connect cables (see electrical connection)
• Fix bracket to wall
• Attach device
17161E00
17225E00
17158E00
1 End cap
2 PCB Termination board
3 PCB and Xenon flash tube
4 Seal
5 Strobe flange
6 Cheese-head screws M5 x 25
Access to the M5 cheese head screws is obscured by the wire guard.
Use a ball end Allen key to allow for the off-axis angle which is required.
4
5
6
3
1
2
Содержание FL6S Series
Страница 19: ......