Commissioning
28
276788 / FL6060300130
2022‐03‐17·BA00·III·en·01
DE
EN
FR
IT
ES
RU
NL
DK
SE
FI
PT
GR
PL
CZ
SK
HU
SL
RO
BG
LV
LT
EE
CH
KR
CN
Visual signalling device
Series FL60/2
8
Commissioning
8.1
Prerequisites
Before commissioning, make sure that:
• the device has been installed according to regulations.
• the line voltage and the rated operational voltage are consistent.
• the permissible cable diameter for the cable entries has been used.
• the cable entries and stopping plugs have been securely tightened.
• the electrical lines have been connected correctly.
• the connection has been performed correctly.
• all screws and nuts are tightened in accordance with the regulations.
• the connection chamber is clean.
• the device is not damaged.
• there are no foreign objects inside the device.
• the device is closed according to regulations.
8.2
Testing
For commissioning, the line voltage must correspond to the rated operational voltage.
When doing so, the following pre-configured functions can be tested, see figure:
• Visible signal
• Control functions (A/B signal)
22798E00
DANGER
Explosion hazard due to incorrect installation!
Non-compliance results in severe or fatal injuries.
• Check the device for proper installation before commissioning.
• Comply with national regulations.
LED
A
LED
A
B
24 V
0 V
0V 24V
B
A
0V 24V
B
A
0V 24V
B
LED
LED