Digital Output Module 8-Channel Version
for Zone 2
Series 9475/33-08-.0
8.3
Installation
The cover flap features an insert disc which can be used to enter the assignment of the
field devices to the channels. IS Wizard can be used, for example, to label the insert disc.
• Connect the field devices to the pluggable terminals X1 according to terminal
assignment (see the "Project engineering" section or insert disc on the inside of the
cover).
• Place the field wiring shields (if available) as close to the entry point on the earthing
rail as possible.
• Where necessary, snap the partition into place on the adjacent Ex i module.
• Plug the pluggable terminal X1 into the module and secure it against loosening using
screws (tightening torque 0.5 to 0.6 Nm).
9
Commissioning
Before commissioning, ensure the following:
• Installation of the device according to regulations.
• Correct connection of the cables.
• No damage at the device and connection cables.
• Tight seat of the screws at the terminals.
Correct tightening torque: 0.5 to 0.6 Nm.
Operation under difficult conditions, such as, in particular, on ships, requires
additional measures to be taken for correct installation, depending on the
place of use. Further information and instructions on this can be obtained
from your regional sales contact on request.
The module and the pluggable terminal X1 can be safely connected or
disconnected during operation in the hazardous area (hot swap).