Commissioning
6
145955 / 8510601300
2011-11-21·BA00·III·en·02
Control Unit
8510/1
9
Commissioning
Before commissioning the control unit ensure that
it has been installed according to standards
it is not damaged
connection has been made correctly
all screws and nuts are fully tightened
no part of the flameproof enclosure is damaged
10 Repairs and Maintenance
Repairs and maintenance work on the control units may only be carried out by
appropriately authorised and trained personnel.
Before work commences the control units must be disconnected from the mains.
The following points must be checked during maintenance:
clamping screws holding the cables are securely seated
cracks in plastic enclosures
11 Accessories and Spare Parts
12 Disposal
Observe the national standard for refuse disposal.
WARNING
Observe the relevant national regulations in the country of use!
WARNING
Use only original spare parts as well as original accessories made by R. STAHL
Schaltgeräte GmbH.
We are pleased to answer any special questions you may have.
Please contact your nearest R. STAHL representative.
Содержание 145789
Страница 1: ...Betriebsanleitung Operating Instructions Steuerger t Control Unit 8510 1...
Страница 2: ......
Страница 3: ...Betriebsanleitung Steuerger t 8510 1...
Страница 10: ...145955 8510601300 2011 11 21 BA00 III de 02...
Страница 11: ...Operating Instructions Control Unit 8510 1...
Страница 18: ...145955 8510601300 2011 11 21 BA00 III en 02...
Страница 19: ......
Страница 20: ...145955 8510601300 2011 11 21 BA00 III de en 02...