23
(
6) The start-up sequence of the UPS is complete as illustrated as drawing E.
Make sure the UPS is plugged onto the wall receptacle for at least 8
hours to ensure the batteries are fully charged. To
turn off
the UPS
press and hold the Off switch until the alarm beeps twice, then release the
switch. The UPS will shut down a few seconds later.
4.4.1.1
Start-up in Battery Mode (Cold Start)
(1) Make sure the UPS has fully charged batteries installed.
(2) Press the UPS On switch for approx. 3 seconds until the audible alarm
sounds twice, then release the On switch. The LCD display will change
from Drawing A to drawing G.
G
(3) Press the UPS On switch of the UPS a second time for approx. 3
seconds until the audible alarm sounds twice, then release the On switch.
Failure to press the On switch a second time within 10seconds will cause
the UPS to shut off. The LCD display changes from drawing G to
drawing H, then the UPS will be in self-test Mode. The Inverter will
supply voltage to the output within 1 minute, and the LCD display changes
to drawing I.
H
I
Содержание UniStar C
Страница 1: ...Form No 003 2308 Rev C 1K 2K 3K UniStar C Intelligent True On Line UPS User Manual ...
Страница 9: ...8 3 2 Rear Panel Descriptions 120V 1KVA 10 8 7 1 2 3 5 4 6 2KVA 3KVA ...
Страница 19: ...18 4 3 Set up Tower Configuration Setup Step 1 Power Module Battery Module Step 1 ...
Страница 20: ...19 Rack Mount Configuration Setup Step 1 Step 2 Step 3 ...
Страница 21: ...20 Step 4 Step 5 ...
Страница 27: ...26 Q1 Q2 R1 R2 S ...
Страница 28: ...27 T U1 U2 U3 V ...
Страница 32: ...31 4 4 3 Battery Replacement Step 1 Step 2 ...
Страница 33: ...32 Step 3 Step 4 1KVA 2K 3KVA ...