STA-RITE SR Скачать руководство пользователя страница 6

36. Reinstall Control Box and Heat Shield assembly; fasten

with three nuts.

37. Reconnect the water pressure switch (if necessary).
38. Reconnect the metering tubes from the Air Flow Switch

and the Combination Gas Control Valve to the
Combustion Air Blower Assembly (see Figure 9).

39. Reconnect exhaust vent pipe and seal with RTV or

epoxy according to vent manufacturer’s instructions.

Risk of carbon monoxide poisoning. Make

sure that entire exhaust vent is sealed after reinstallation.

40. Reconnect all wiring. See Figure 10 for Junction-box

connections, and see Page 7 for complete wiring
schematic.

41. Before starting the heater, test for gas leaks from piping

and around Combustion Chamber cover with a soapy
water solution.

42. Check for water leaks at unions and at manifold flange

(where it joins the tube sheet).

43. Reinstall jacketing and test heater by running it through

one complete cycle. Test for exhaust leaks from exhaust
vent pipe while cycling heater.

44. Heater is ready for service.

6

Wire into bottom
of Junction-box 
in Flexible Conduit

Wiring Harness
to Control Box

Black to Black

White to White

Green (Ground)

to

Green (Ground)

Bonding 
Wire

View From Above
(Interior)

Figure 10: Junction Box Wiring Connections

For detailed installation, operation, maintenace
and safety information about the Sta-Rite pool
heater, call customer service at 1-800-752-0183
and request a Sta-Rite Pool/Spa Heater Training
and Service manual, publication S5066.

Prolonged exposure to the ceramic fiber insulation in
the combustion chamber may cause cancer. May also
cause temporary eye, skin, or respiratory tract irritation.
Avoid breathing fiber particulates and dust.

Wear a NIOSH/MSHA approved respirator, loose, long sleeved clothing, eye protection, and gloves when working with
or around insulation. Wash work clothes separately. Rinse washing machine after use.

For first aid:

Eyes: Flush with water.
Skin: Wash with soap and water.
If swallowed: Do not induce vomiting. Get medical attention if gastrointestinal symptoms develop. 
If inhaled: Get to fresh, clean air.
If any of the irritations above persist, seek medical attention immediately.

For additional product information or for a Material Safety Data Sheet (MSDS), call 

1-800-752-0183

Содержание SR

Страница 1: ...et Delavan WI 53115 North America 800 752 0183 FAX 800 582 2217 International 262 728 5551 FAX 262 728 4461 TELEX ITT 4970245 www sta ritepool com Union City TN Delavan WI Mississauga Ont Murrieta CA 2003 Sta Rite Industries Inc Printed in U S A S430 Rev 2 14 03 ...

Страница 2: ...lectrical power to the heater Close the external Manual Gas Valve 2 If the heater is below the water level of the pool close the isolation valves to avoid draining the pool 3 Remove the drain plug under the manifold and drain the heater 4 While the heater is draining remove the upper left and upper right jacket halves 5 Remove the switch covers on both sides of the mani fold and unplug the wires f...

Страница 3: ...the weights involved 19 Cut the RTV all the way around the top of the Combustion Chamber with a screwdriver 20 With a mallet and screwdriver go around the Combustion Chamber cover tapping up until the RTV separates and releases the Combustion Chamber cover Be careful not to damage the Combustion Chamber 21 Remove the Combustion Chamber cover California s Proposition 65 lists Refractory Ceramic Fib...

Страница 4: ...of bolts into it and pull it back in place Brush off all dust and debris with a brush and wipe it down with a cloth Apply silicone grease supplied to O Rings Clean the tube sheet and O ring sealing surface with a nylon brush then brighten the tube sheet surface with 320 grit emery cloth 1 2 3 Figure 4 Clean the Tube Sheet and O Ring sealing sur faces thoroughly as described above Figure 6 Install ...

Страница 5: ...ociated piping and the Blower Adapter Plate as a unit use new gaskets Be sure to reinstall the Insulation Cap on the bottom of the Flameholder Tighten Adapter Plate nuts to 70 80 in lbs torque See Figure 9 1 2 3 6 7 10 5 4 9 8 75 115 in lbs 8 4 12 9 N m Torque Pattern All Models 1 Make sure that all bolts are engaged and hand tight 2 Torque the bolts in sequence as shown Some noise popping etc is ...

Страница 6: ...om of Junction box in Flexible Conduit Wiring Harness to Control Box Black to Black White to White Green Ground to Green Ground Bonding Wire View From Above Interior Figure 10 Junction Box Wiring Connections For detailed installation operation maintenace and safety information about the Sta Rite pool heater call customer service at 1 800 752 0183 and request a Sta Rite Pool Spa Heater Training and...

Страница 7: ...1 L2 BM FL F1 L2 S2 TH IND VAL GND GND GND GND BLOWER 120VAC 120VAC HOT 120VAC IGNITER MOT TRANS TRANS GROUND GND NEUTRAL NEU JUNCTION BOX F I R E M A N S S W I T C H Replace jumper with leads to Fireman s Switch field installed 24VAC SEC PRIM 120VAC Y W Y W Y R Y O Y BL BK GY GY BK BK W W BK W W W W G G Y Y Y Y BK BK Y W W W R R BL BL O O O O PR PR Y R Y BL Y O Y W Y Y Y Y Y Y Y Y Y BR BR 3661 02...

Страница 8: ...nsulation Cap 1 42001 0075 2 1 2 Blanket 1 42001 0071 3 1 Top Insulation 1 42001 0070 4 Condensate Evaporator 1 42001 0065 5 1 M Insulation 1 42001 0072 6 1 2 Blanket 1 42001 0073 1 2 3 4 6 5 3125 1197 Model SR SRC200 heaters built before 1 1 98 use 2 of Part No 42001 0073 ...

Отзывы: