29. Tighten the bolts to the torque spec as shown in Figure 7.

30. Turn on the water and check for leaks between the

Manifold Adapter and the Tube Sheet.

31. Install one piece of 1” top Insulation on top of the Heat

Exchanger and one 1/2” Insulation Blanket over the top
Insulation. Make sure that the insulation is centered on
the coil so that an equal number of heater coil fins
shows around the insulation.

32. Apply fresh High Temperature RTV (600°F Continuous,

700° F. Intermittent rating) all the way around the
inside top of the Combustion Chamber and the outside
of the Combustion Chamber cover (see Figure 8).

33. Reinstall the Combustion Chamber top and fasten with

nuts on studs from Combustion Chamber body.

34. Reinstall the Combustion Chamber in the Lower

Enclosure and fasten with hold-down nuts.

35. Reinstall the Flameholder and Flameholder Cone (if

used), and then the Combustion Air Blower, the Igniter,
the Combination Gas Valve and associated piping and
the Blower Adapter Plate as a unit; use new gaskets. 
Be sure to reinstall the Insulation Cap on the bottom of
the Flameholder. Tighten Adapter Plate nuts to 70-80
in.-lbs. torque. See Figure 9.

1

2

3 6

7

10

5

4

9

8

75-115 in.-lbs./8.4-12.9 N-m

Torque Pattern - All Models

1. Make sure that all bolts are engaged and hand tight.
2. Torque the bolts in sequence as shown. Some noise

(popping, etc.) is normal as you tighten.

3. Go around the manifold and retighten the bolts as

needed to 75-115 in-lbs. (8.4-12.9 N-m) (you may
have to do this several times).

Figure 7: Torque Specs.

Apply RTV
here
and
here.

Apply RTV bead all the way around
both Combustion Chamber and Cover.

3140 0198

Figure 8: RTV Application For Reassembly

Reinstall Control Box 
and Heat shield Assembly

Flameholder/Adapter
Plate Gasket

Flameholder/Combustion 
Chamber Gasket

3123 1197

1

2

3

At reassembly, connect tubing 
as shown:

1.  From Air Inlet Port to 
     Combination Gas Valve;
2.  From Air Inlet Port to
     Air Flow Switch;
3.  From bottom of Blower to
     Air Flow Switch.

dapter

r/Combustion 

asket

3123 1197

Figure 9: Make sure new gaskets are in place when
reassembling combustion chamber.

Содержание SR

Страница 1: ...et Delavan WI 53115 North America 800 752 0183 FAX 800 582 2217 International 262 728 5551 FAX 262 728 4461 TELEX ITT 4970245 www sta ritepool com Union City TN Delavan WI Mississauga Ont Murrieta CA 2003 Sta Rite Industries Inc Printed in U S A S430 Rev 2 14 03 ...

Страница 2: ...lectrical power to the heater Close the external Manual Gas Valve 2 If the heater is below the water level of the pool close the isolation valves to avoid draining the pool 3 Remove the drain plug under the manifold and drain the heater 4 While the heater is draining remove the upper left and upper right jacket halves 5 Remove the switch covers on both sides of the mani fold and unplug the wires f...

Страница 3: ...the weights involved 19 Cut the RTV all the way around the top of the Combustion Chamber with a screwdriver 20 With a mallet and screwdriver go around the Combustion Chamber cover tapping up until the RTV separates and releases the Combustion Chamber cover Be careful not to damage the Combustion Chamber 21 Remove the Combustion Chamber cover California s Proposition 65 lists Refractory Ceramic Fib...

Страница 4: ...of bolts into it and pull it back in place Brush off all dust and debris with a brush and wipe it down with a cloth Apply silicone grease supplied to O Rings Clean the tube sheet and O ring sealing surface with a nylon brush then brighten the tube sheet surface with 320 grit emery cloth 1 2 3 Figure 4 Clean the Tube Sheet and O Ring sealing sur faces thoroughly as described above Figure 6 Install ...

Страница 5: ...ociated piping and the Blower Adapter Plate as a unit use new gaskets Be sure to reinstall the Insulation Cap on the bottom of the Flameholder Tighten Adapter Plate nuts to 70 80 in lbs torque See Figure 9 1 2 3 6 7 10 5 4 9 8 75 115 in lbs 8 4 12 9 N m Torque Pattern All Models 1 Make sure that all bolts are engaged and hand tight 2 Torque the bolts in sequence as shown Some noise popping etc is ...

Страница 6: ...om of Junction box in Flexible Conduit Wiring Harness to Control Box Black to Black White to White Green Ground to Green Ground Bonding Wire View From Above Interior Figure 10 Junction Box Wiring Connections For detailed installation operation maintenace and safety information about the Sta Rite pool heater call customer service at 1 800 752 0183 and request a Sta Rite Pool Spa Heater Training and...

Страница 7: ...1 L2 BM FL F1 L2 S2 TH IND VAL GND GND GND GND BLOWER 120VAC 120VAC HOT 120VAC IGNITER MOT TRANS TRANS GROUND GND NEUTRAL NEU JUNCTION BOX F I R E M A N S S W I T C H Replace jumper with leads to Fireman s Switch field installed 24VAC SEC PRIM 120VAC Y W Y W Y R Y O Y BL BK GY GY BK BK W W BK W W W W G G Y Y Y Y BK BK Y W W W R R BL BL O O O O PR PR Y R Y BL Y O Y W Y Y Y Y Y Y Y Y Y BR BR 3661 02...

Страница 8: ...nsulation Cap 1 42001 0075 2 1 2 Blanket 1 42001 0071 3 1 Top Insulation 1 42001 0070 4 Condensate Evaporator 1 42001 0065 5 1 M Insulation 1 42001 0072 6 1 2 Blanket 1 42001 0073 1 2 3 4 6 5 3125 1197 Model SR SRC200 heaters built before 1 1 98 use 2 of Part No 42001 0073 ...