Safe Personnel Blow-Off & Drying System
Installation & Operation Manual
MODELS:
JKL-115JKL-240
Страница 1: ...Safe Personnel Blow Off Drying System Installation Operation Manual MODELS JKL 115 JKL 240...
Страница 2: ...Installation Operation Manual will help you to achieve optimal perfor mance with your Jet Kleen Limited by guiding you through the proper steps for setup operation and maintenance of the unit The man...
Страница 3: ...chnology air flow system Virtually maintenance free OPTIONS AND ACCESSORIES Wall Mount Bracket Quick Disconnect Swivel Connector Ergonomic Pliable Plastic Chip Guard Pliable Plastic Nozzle Replacement...
Страница 4: ...g of the contents of this manual Therefore it is the responsibility of the Equipment Owner to ensure that every operator of this equipment 1 Read understand and observe the procedures recom mended in...
Страница 5: ...he closed posi tion rotate the locking ring on the swivel connector Figure 2 counterclockwise 180 until it clicks 2 Push the new nozzle assembly firmly into place 3 Close the locking ring by rotating...
Страница 6: ...pressure greater than 3 PSI is legally prohibited in Europe In the US we conform to OSHA Standard number 1910 242 B GOVERNMENT REGULATIONS The Jet Kleen Limited has been designed in accordance with t...
Страница 7: ...Feet Set of 4 JKL GA Complete Handle Assembly JK NO Included JKL FMH Hose Without Adapter for Swivel Connector JKL FMHS Hose With Adapter for Swivel Connector JK NO Nozzle JK FE Filter JKL VM Vacuum M...
Страница 8: ...ption without charge when returned within 30 days from the date the Return Authorization was issued Specialized Safety Products A W T is not obligated to cover any freight costs Customers must obtain...