background image

It is very important that once the vessel is empty and ready to be cleaned that the residual 

pressure buildup is released from the vessel before removing the lid cap. To perform this step, 

open the sampling valve, and allow all pressure to bleed off before loosening any of the TC 

connections on the vessel. Failure to do so could cause personal property damage, serious 

bodily injury, or death.

 

Never allow a vacuum to form within the vessel. During crash cooling or liquid extraction  

ALWAYS attach a CO2 system to the vessel and supply an amount of pressure that is less 

than the rated operating pressure of 15 PSI. Alternatively, open the blow-off cane’s ball valve 

to compensate for liquid contraction. Never attach a diaphragm, vacuum, or centrifugal pump 

to the vessel without sufficient head venting. Failure to do so could cause personal property 

damage, serious bodily injury, or death.

Always assume contents are under pressure. This vessel has been designed and tested to con-

form with widely accepted beer serving and carbonating pressures. Never exceed the pressure 

threshold of 30 PSI, and never operate the vessel without the PRV in place. Never use the 

vessel in a manner than is otherwise directed. Always keep out of reach of children. 

WARNING

PRIOR TO USE

Page 11

After assembling your Unitank, we recommend a pressure / leak test before introducing any chemicals 

for cleaning or product to the vessel. To do so, simply fill the vessel with enough water to cover the 

lower ports then seal up the vessel by closing all valves. Next, introduce head pressure through the 

blow-off arm. We recommend the full operating load of 15 PSI for testing purposes. Check for leaks 

over the course of a few hours and take note of any gaskets or TC clamps that may need to be adjusted 

or tightened. Once testing is completed, carefully vent the tank by slowly opening the butterfly valve on 

the blow-off arm.

PRESSURE / LEAK TESTING

Содержание Jacketed Unitank

Страница 1: ...ENGINEERING BETTER BEER Jacketed Unitank ...

Страница 2: ...tary Pressure Gauge 1 1 5 TC Analog Temperature Gauge 1 DIN Nut Rotatable Racking Arm w 1 5 TC Port 1 3 TC Clamp 10 1 5 TC Clamp 1 3 TC Gasket 10 1 5 TC Gasket 3 1 5 TC Butterfly Valves 1 Stainless Lower Shelf 1 1 5 TC Perlick Style Sampling Valve 1 1 5 TC Carbstone w 3 8 Ball Valve 1 1 5 TC PT100 Thermoprobe 4 Threaded Stem Adjustable Feet NOTE Certain features come preinstalled on the vessel for...

Страница 3: ...P PRV CIP PORT 1 5 TC PRESSURE GAUGE A 3 TC Pressure Release Valve PRV G 1 5 TC Pro Sanitary Pressure Gauge B 3 TC Gasket H 1 5 TC Gasket C 3 TC Clamp I 1 5 TC Clamp D 8 or 12 TC Lid E 8 or 12 TC Lid Gasket F 8 or 12 TC Lid Clamp A G B H C I D E F Page 3 ...

Страница 4: ...TANK FEATURES ASSEMBLY J 1 5 TC Blow Off Arm H 1 5 TC Gasket I 1 5 TC Clamp K Clamp L Butterfly Valve J H I K K H I L Page 4 1 5 TC BLOW OFF ARM W BUTTERFLY VALVE ...

Страница 5: ... 5 TC CARBONATION STONE WITH 3 8 BALL VALVE 1 5 TC ANALOG TEMPERATURE GAUGE M 1 5 TC Carbstone w 3 8 Ball Valve M 1 5 TC Analog Temperature Gauge H 1 5 TC Gasket H 1 5 TC Gasket I 1 5 TC Clamp I 1 5 TC Clamp M M H H I I Page 5 ...

Страница 6: ...EATURES ASSEMBLY 1 5 TC PERLICK SAMPLE VALVE 1 5 TC THERMOPROBE N 1 5 TC Perlick Style Sampling Valve O 1 5 TC Thermowell Probe H 1 5 TC Gasket H 1 5 TC Gasket I 1 5 TC Clamp I 1 5 TC Clamp N O H H I I Page 6 ...

Страница 7: ... RACKING ARM 1 5 TC BUTTERFLY DUMP VALVE L 1 5 TC Butterfly Valve L 1 5 TC Butterfly Valve H 1 5 TC Gasket H 1 5 TC Gasket I 1 5 TC Clamp P DIN Nut Rotatable Racking Arm w 1 5 TC Port I 1 5 TC Clamp Q Elbow L L H H I I Q H I P Page 7 ...

Страница 8: ...TANK FEATURES ASSEMBLY STAINLESS STEEL SHELF FEET R Stainless Steel Shelf S Threaded Stem Adjustable Feet R S S Page 8 ...

Страница 9: ...TANK FEATURES ASSEMBLY 1 2 NPT GLYCOL RETURN LINE PORT 1 2 NPT GLYCOL SUPPLY LINE PORT T 1 2 NPT Glycol Return Line Port U 1 2 NPT Glycol Supply Line Port Page 9 T U ...

Страница 10: ...acle and plug back in to the PT100 Thermoprobe Secure assembly with screw 1 Disconnect unplug units from any power outlets 2 Remove screw and unplug receptacle from the PT100 Thermoprobe 3 Use the flat head screwdriver slot to remove face of receptacle 4 Feed temperature sensor wires through receptacle WIRING INSTRUCTIONS 1 2 MSD 3 3 10A 250V 2 2 3 1 1 5 TC PT100 Thermoprobe Plug Receptacle Screw ...

Страница 11: ...serious bodily injury or death Always assume contents are under pressure This vessel has been designed and tested to con form with widely accepted beer serving and carbonating pressures Never exceed the pressure threshold of 30 PSI and never operate the vessel without the PRV in place Never use the vessel in a manner than is otherwise directed Always keep out of reach of children WARNING PRIOR TO ...

Страница 12: ...mical provider to obtain the best practices for passivation of 304 stainless steel based on the chemical being used Before use it is important to ensure that your analog thermometer and PT100 thermo probe are properly calibrated and consistent with one another There are several ways of calibrating a thermometer and thermo probe but the simplest way is to use an ice water mixture When you insert yo...

Страница 13: ...ly and with the utmost attention to safety Organic soil loads are most effectively cleaned using an alkaline cleaning agent PBW Powdered Brewery Wash has become the go to cleaning product for many homebrewers It is relatively safe to use and effective on light medium soil loads Professional breweries on the other hand tend to use some type of non chlorinated caustic for cleaning purposes Caustic i...

Страница 14: ...REV 02112019 SsBrewtech com ...

Отзывы: