Ensure φ 10mm inlet length is sufficient to reach the controller inlet
interface.
The φ 6 mm outlet pipe should be connected to the end
fixture after the filter, and the total length is in the range of 3-5 m.
When the gas path is connected, it is ensured that the trachea is
completely inserted into the fast insertion joint. In the insertion process,
there is a clear sense of sudden frustration to prove that the gas path is
connected correctly. After opening the industrial gas source, twisting the
debugging switch, and running three to five times, it is ensured that the
gas path is connected well. If air leakage is found, the gas source and
power supply switch are shut down immediately, and after the air
leakage is eliminated, it can be continued to use.
Notes on Airway Connection:
1、Fully blow or wash the end, oil and dust of the pipe before piping.
2 、 When the controller is connected to the trachea, the bending and
blockage of the trachea are avoided as far as possible, otherwise it is
easy to cause the instability of the pneumatic system of the controller.
3、Do not make mistakes in product inlet and outlet.
4 、 Ensure the air tightness of the product outlet to the end actuator
trachea.
5、Series filter can ensure the service life of the end fixture and pneumatic
controller, and the filter should be between the controller and the end
fixture.
The following diagram is the schematic diagram of gas path connection
for SCB-PT series controllers:
Soft
φ10 pipe
SCB-PB Passive
pneumatic controller
Φ6 pipe
Φ6 pipe
Filter
Clean
industrial
gas source