
Waukesha Cherry-Burrell
Installation and Operation
April 2005
95-03077
Page 11
Wiring Instructions: Switches and Solenoids
DANGER:
To avoid electrocution, all electrical work should be done by a registered electrician following
industry safety standards.
All power must be off and locked out.
PAGE, FIGURE
SOLENOID
VOLTAGE
SWITCH
Micro
Proximity
Parker (optional)
AC
X
Parker (optional)
DC
X
Parker (optional)
AC
2-Wire
Parker (optional)
DC
2-Wire
Parker (optional)
DC
3-Wire
1 Clippard
DC
X
2 Clippard
DC
X
3 Clippard
DC
X
Parker (optional)
DC
3-Wire
1 Clippard
DC
2-Wire
2 Clippard
DC
2-Wire
3 Clippard
DC
2-Wire
1 Clippard
DC
3-Wire
2 Clippard
DC
3-Wire
3 Clippard
DC
3-Wire