Z03
L09
J02R/L
Z02
T08
1
2
3
27
1
1 1
1 1
2
2
3
3
3
QTY.
NO.
PART
L09
2
J01
2
J02R/L 2/2
16
10
Z02
Z03
T08
J07
J08
4
4
4
L09
Ø
4X16D
Ø
5X30
Install the L09 gutter profile over the edges of the panels,
ensuring the rubber strip seals against the panels.
Then fix into place with the Z03 screws, do not over tighten.
J01
J01
T08
J07
T08
Z02
J 08
Drill one hole on both
L01A & D approx 500mm up
from the bottom, Dia. 3.2mm,
then tighten J08 with Z02,
and push T08 into the channel
To avoid leaking,
using silicone on
J02R / L, T08 and J07
of J08 (see Fig. above).
is an option
(see Fig. above).
Содержание GRANGE-3,3000
Страница 18: ...18 L03E L03F 1 2 1 2 L03E L03F Y2 Y2 QTY NO PART L03E 1 L03F 1 Y2 2...
Страница 20: ...20 1 2 L05A L05A Y1 Y4 Y5 Y4 Y3 Y1 QTY NO PART 4 M01 L05A 2 4 S01 Y3 1 Y1 2 Y4 2 Y5 1 L05A L05A M6X12 M6...
Страница 21: ...21 2 1 3 L01B D F L01B L01C L01C E L01C L01B L01C 1 1 2 2 3 3 L01B QTY NO PART L01B 2 L01C 2 F 2...
Страница 22: ...22 1 L06 2 W01 L01B W01 L01C 3 2 2 3 3 1 1 L06 QTY NO PART 16 M01 1 16 S01 L06 W01 4 M6X12 M6...