25
QTY.
NO.
PART
L15A
2
2
L15A
4
Z02
4
S02
8
Z04
W08
2
W08A
2
12
M01
Roof Vent
Roof Vent
Roof Vent
Ø
4X16D
Ø
4X10D
M6X20
M6
S05
M5X35
M05
M5
8
8
M06
M5
8
L15A
S02/M01
L06
L06
L15A
L15A
L15A
Z02
Z02
1
2
3
Z04
L21
W06
W08
L04E
Z04
L21
W06
W08A
L04E
4
3
5
Z04
S01/M01
L04E
L21
Use the nut M06 to secure the long screw S05 through the holes of
*The wingnut M05 must be secured once the vent arm W06 is locked
S05
M06
M05
W08/W08A
each W08 & W08A.
in place in windy days.
Note: If you have a greenhouse with an extension kit, the W08/W08A
will have pre-riveted pins. It is ideal to use the wingnut fittings
on the windy elevation of the greenhouse.
S05/M06
S05/M06
Содержание GRANGE-3,3000
Страница 18: ...18 L03E L03F 1 2 1 2 L03E L03F Y2 Y2 QTY NO PART L03E 1 L03F 1 Y2 2...
Страница 20: ...20 1 2 L05A L05A Y1 Y4 Y5 Y4 Y3 Y1 QTY NO PART 4 M01 L05A 2 4 S01 Y3 1 Y1 2 Y4 2 Y5 1 L05A L05A M6X12 M6...
Страница 21: ...21 2 1 3 L01B D F L01B L01C L01C E L01C L01B L01C 1 1 2 2 3 3 L01B QTY NO PART L01B 2 L01C 2 F 2...
Страница 22: ...22 1 L06 2 W01 L01B W01 L01C 3 2 2 3 3 1 1 L06 QTY NO PART 16 M01 1 16 S01 L06 W01 4 M6X12 M6...