background image

8

04GREEN0806SD-V2

8X6 GREENHOUSE

2mm Drill bit

x2

Winter = High Moisture = Expansion

Summer = Low Moisture = Contraction

All building’s should be 

erected by two adults

For ease of assembly, you 

MUST

 pilot drill all screw 

holes and ensure all screw 

heads are countersunk.

For assistance please contact customer care on: 01636 880514

Mercia Garden Products Limited, 

Sutton On Trent, 

Newark, 

Nottinghamshire, 

NG23 6QN

www.merciagardenproducts.co.uk

CAUTION

Every effort has been made during the 

manufacturing process to eliminate the 

prospect of splinters on rough surfaces of the 

timber.  You are strongly advised to wear gloves 

when working with or handling rough sawn 

timber.

**Protim Aquatan T5 (621)**

Your building has been treated with 

Aquatan

.

Aquatan is a water-based concentrate which is diluted with water, the building as been treated by the correct 

application of Aquatan solution and then allowed to dry.

Aquatan is a decorative finish to colour the wood, which is applied industrially to timber fence panels and 

garden buildings.

Aquatan 

undiluted

 contains:

 boric acid, sodium hydroxide 32% solution, aqueos mixture of sodium dioctyl 

sulphosuccinat and alcohols: 2, 4, 6-trichlorophenol.

Please retain product label and instructions for future reference

             

General Instructions

BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY 

- Check the pack and make sure you have all the parts listed. 

- When you are ready to start, make sure you have the right tools at hand (not supplied) 

including  a Phillips screwdriver, Stanley knife, wood saw, step ladder and drill with 2mm 

bit.

- Ensure there is plenty of space and a clean dry area for assembly. 

TIMBER

As with all natural materials, timber can be affected during various weather conditions. 

For the duration of heavy or extended periods of rain, swelling of the wood panels may 

occur. Warping of the wood may also occur during excessive dry spells due to an interior 

moisture loss. Unfortunately, these processes cannot be avoided but can be helped. It is 

suggested that the outdoor building is sprayed with water during extended periods of 

warm sunshine and sheltered as much as possible during rain or snow. 

Our buildings are pre treated with a water based treatment**; this only helps to protect 

the product during transit and for upto 3 months against mould.  To validate your 

guarantee and ensure longevity of the product, it is ESSENTIAL the building is treated 

with a wood preserver within the first three months of assembly and thereafter in 

accordance with the manufactures recommendations.  Care must be taken to ensure 

the product is placed on a suitable base.

BUILDING A BASE

When thinking about where the building and base is going to be constructed: 

Ensure that there will be access to all sides for maintenance work and annual 

treatment.

Ensure the base is level and is built on firm ground, to prevent distortion.  Refer to 

diagrams for the base dimensions,  The base should be slightly smaller than the external 

measurement of the building, i.e. The cladding should overlap the base, creating a run 

off for water. It is also recommended that the floor be at least 25mm above the 

surrounding ground level to avoid flooding.

TYPES OF BASE

- Concrete 75mm laid on top of 75mm hard-core.

- Slabs laid on 50mm of sharp sand.

Whilst all products manufactured  are made to the highest standards of Safety and in 

the case of childrens products independently tested to EN71 level, we cannot accept 

responsibility for your safety whilst erecting or using this product.

Refer to the instructions pages for you specific product code

Содержание 04GREEN0806SD-V2

Страница 1: ... affected during various weather conditions For the duration of heavy or extended periods of rain swelling of the wood panels may occur Warping of the wood may also occur during excessive dry spells due to an interior moisture loss Unfortunately these processes cannot be avoided but can be helped It is suggested that the outdoor building is sprayed with water during extended periods of warm sunshi...

Страница 2: ...PlainGableTop 8 Door 9 Opening Window 11 Fascia 1025mm Base Frame 1862mm 12 Base Frame 2268mm 13 13 Roof Support Bar 2382mm 14 15 Butterfly Hinges QTY 2 Window Casement Stay Butt hinge QTY 2 16 Finial Qty 2 17 18 35mm Wooden Knob 8x70mm Screws Lay the base frame down as shown in the diagram Ensure the base is square and layed on level ground fix the base together with 2 x 70mm screws per corner pr...

Страница 3: ...the remaining window panel at the corner using 3 x 50mm screws Screw to the base using 8 x 50mm screws Step 4 Fix the door sides to the window panels and to the base using 10x50mm screws Pre drill hole 50mm screw 17 x 50mm screws Pre drill hole 50mm screw 10x50mm Screws Pre drill hole 50mm screw Step 5 Fix the gable tops to the panels using 4x50mm screws per top as shown in the diagram 8x50mm Scre...

Страница 4: ...mm screws per casement stay 15 6x20mm Screws Step 7 Place the roof panels on top of each gable making sure the roofs are flush to each gable and meet at the top of the apex Secure each roof panel to the building using 16x50mm screws 16x50mm Screws Pre drill hole 50mm screw Step 8 Attach the roof support bar to the roof panels using 5x40mm screws Screw diagonally through the support into the roof p...

Страница 5: ...ws Step 10 Fit the fascia s and the finial s to the building using 14x30mm screws as shown in the diagram 14x30mm Screws Pre drill hole 30mm screw SILICONE SEALANT Step 11 It is advisable to seal around all window framing with silicone sealant not included to minimize water ingress Please note This image is for illustrative purpose and may differ from your product in regards to the number of windo...

Отзывы: