11
98-05238 R1 EN-US
HOME
OVER
VIE
W
SE
TUP
POWER
APPENDIX
FULL SCREEN
INTR
ODUC
TION
GUID
ANCE
Chapter 2 – power
power on
Press the POWER BUTTON to power on the console.
Upon power up, the Matrix Pro will begin its Start Up Sequence.
power off
Press and briefly hold the POWER BUTTON until a confirmation
screen acknowledges shut down mode.
WARNING! Wait 30 seconds before restarting the console after
powering off.
Figure 2-1: Power Button
Power Button
Power Button
Start up Sequence
The console takes approximately 40 seconds to power up. During
this time a series of screen including the TeeJet Technologies logo,
a globe, an hourglass and an information screen will be displayed
(LEDs will power on and off and brightness levels will fluctuate.)
Once the power up sequence has completed, the Home screen will
appear.
Figure 2-2: Home Screen - Simple Mode
12/14/10 3:52 AM
do you want to start a new job data or continue last job?
Starting a new job will clear the previous job data.
New Job
Continue
Figure 2-3: Home Screen - Advanced Mode
4/4/11 6:38 AM
Job
Client: Mr. Nelson
New Job
Field: Nelson Plot #23
Farm: Townville Station
Start Job
Fertilize