10106 rev. A
16
STEP 3:
Remove nuts and washers from the right
side of base module, leaving bolts in
place. Install first cross tube on extension
and install bolts and washers through
right side. Add nuts on the open bolts to
the left of the extension.
Do not install nuts or washers at this
time, if there are more extensions that
need to be installed.
STEP 4:
Continue process until all cross tubes are
installed.
Once complete, tighten all fasteners on
cross tubes and on lower connecting
bars.
Refer to Part 2 Step 1 for installation
instructions for bicycle trays.
NOTE:
If the layout is planned with
adequate ingress, egress, and loading
aisle clearances, install floor anchors
now, prior to bicycle tray installation
referring to Part 2 Step 5. If modules may
be later moved, install floor anchors after
bicycle tray installation.
For questions or support please contact our sales and support team at:
Содержание TERRACE
Страница 1: ...10106 rev A TERRACE ASSEMBLY INSTRUCTIONS ...