
34
3
Step 6
1. First, assemble the pulley block by screwing two rollers between two flat connectors. Fix the compo-
nents with two screws (3), four washers and two nuts.
2. Feed cable A through points a-e for the top lat pulldown. Mount the end of the cable on the lift rod
and use a screw (2), two washers, and a nut.
3. Feed cable B through points f-h for the lower lat pulldown. Connect the cable to the eyelet of the lat
pulldown frame using a chain and snap hook.
a
b
c
d
e
f
g
h
1.
2.
3.
2
3
4
6
3
6
6
1
6
3
3
(2x) (M10x45)
2
(4x) (M10x20)
Cable A
Cable B
Содержание FPR300
Страница 1: ...FPR300 FPR350 DE EN ES FR IT NL Power Rack...
Страница 2: ......
Страница 123: ......