Punch List 

 

Step 1:  Layout 

 

1.  Lay  decks on ground in the desired location based on 

topview layout and measure from all corners to insure 
there is adequate room.  (Refer to Grid Drawing pg. 11) 

2.  Most installers usually like to orientate the playground 

so that the entry point of the playground is facing either 
the sidewalk or the direction from which the children 
are coming. 

 

Step 2:  Holes 

 

1.  Mark the locations of all post holes by laying out all the 

decks in the correct orientation.  Make sure all the 
decks are touching each other and flush on the edges.  
Then use the center point of each deck corner and 
marking them with paint or a wooden stake. 

2.  After the holes are marked, move the decks out of the 

digging area and dig the first four holes per the footing 
drawing on page 12. 

3.  Fill or dig the depth of 1 main hole to what is required; 

this hole will be used to get the other three holes the 
same depth in reference to each other.  Make sure the 
hole is flat and tamped solid, then place a small piece of 
plywood or brick in the bottom.  You must take this in 
account when determining the hole depth. 

4.  Now, if possible, use a transit to maintain the same hole 

depth on the remaining three holes, if you don’t have 
access to a transit, then park a line on the first post 
about two inches above the dirt level.  Then measure up 
from the bottom of the post to this mark and mark a line 

on the other three posts at the same distance.  Now use 
a four-foot level across to each line, raising or lowering 
as necessary to make the lines level.  Repeat this for the 
remaining two posts. 

 

Step 3:  Deck and Post Installation 

 

1.  Begin by installing the lowest deck and go up from this 

one.  Measure deck height plus the amount of safety 
surfacing and make a mark on the post, this is the 
height of the deck clamps, for example if the deck is to 
be 36” high and you are planning on adding 12” of 
safety surfacing then the height from the dirt would be 
48”.  All other decks heights will also be the labeled 
height plus the amount of surfacing. 

2.  Install a deck clamp per instruction page 15.  Tighten 

all hardware. 

3.  Now make sure that you have two other helpers and the 

required deck clamp hardware. 

4.  Stand the correct posts into the holes and lift the deck 

on top of the clamps and install hardware.  Be sure to 
brace the posts to keep them from moving. 

5.  Continue building the main structure by adding the 

overhead climber, kickplates and other decks and posts 
per the illustration until all the decks, kickplates, and 
posts are installed.  Make sure the posts are level as you 
tighten the hardware, this will make the component 
installation much easier. 

6. 

It may be necessary to brace the deck and posts with 
lumber to make sure they stay in place and level.  Also 
make sure the deck was installed level.

 

 
 

Содержание Independent Spiral Slide

Страница 1: ......

Страница 2: ...60 Fax 314 389 9034 www sportsplayinc com Distributor SportsPlay Inc Date Drawn By SportsPlay SportsPlay SportsPlay SportsPlay E Barron 00 00 11 ASTM Compliant CPSC Compliant Project 6 Ind Spiral Sli...

Страница 3: ...34 www sportsplayinc com Distributor SportsPlay Inc Date Drawn By SportsPlay SportsPlay SportsPlay SportsPlay E Barron 00 00 11 ASTM Compliant CPSC Compliant Project 6 Ind Spiral Slide 5642 Natural Br...

Страница 4: ...cket style small L arm wrench styles etc Vise grips large regular and needle nose 3 4 and 1 2 and 9 16 sockets both 1 2 and 3 8 drives 6 and 8 stepladders strong ones Extension cords also duplexes to...

Страница 5: ...equipment at regular intervals During inspection if any part is found damaged or excessively worn equipment should immediately be put out of service while the part is replaced Lack of maintenance wil...

Страница 6: ...decide how much safety surfacing is required Before spreading loose fill surfacing be sure to install a weed barrier outside the fall zone dimension then spread the safety surfacing LAST THING Make on...

Страница 7: ...ember that loose fill will compress with repeated use Weed mat Some use a landscaping fabric material that allows drainage but prevents weed growth Weed mats are installed after the structure is insta...

Страница 8: ...djust your dirt grade height accordingly Chart taken from The Handbook for Public Playground Safety written by the U S Consumer Product Safety Commission CPSC page 5 www cpsc gov Material Uncompressed...

Страница 9: ...hes above the dirt level Then measure up from the bottom of the post to this mark and mark a line on the other three posts at the same distance Now use a four foot level across to each line raising or...

Страница 10: ...x per instructions on concrete bag Be sure to leave concrete about 2 from the top of the ground to allow backfill 2 Be sure that all splattered concrete is washed off of the posts and components while...

Страница 11: ...ng Recommendations 2 Backfill 12 Sheet 1 of 2 Sheet 1 of 2 Sheet 1 of 2 Sheet 1 of 2 Concrete Surfacing Ground Cover Backfill Playground Soil Natural Finished Brick Post Side View of installed Post Si...

Страница 12: ...ng this depth changes slightly with grade Place a brick or block in the bottom of the hole Post Post Post Post Depth in concrete varies based upon surfacing Depth in concrete varies based upon surfaci...

Страница 13: ...E DECK 912 333 PART NUMBER DESCRIPTION QTY 1 905 903 Square Deck 1 2 126 703 3 8 x 1 Button Head Bolt 8 3 316 601 3 8 Flat Washer 8 ITEM NO PART NUMBER DESCRIPTION QTY 1 905 904 Triangle Deck 7 2 126...

Страница 14: ...he table will stabilize the deck so you can level it You can make a table from sawhorses Deck stand or table holds deck while you build around it Block stabilize the posts while table stabilizes the d...

Страница 15: ...3 8 Socket Set Screw 6 7 905 208 Gasket for Attachment Bracket 2 8 905 526 1 4 Self Tapping Pinned Screw 4 9 126 708 3 8 x 2 1 4 Button Head Bolt Table Table Table Table Deck Height Post Footing Dista...

Страница 16: ...Mark holes on the ground for the two bottom legs 20 apart Remove ladder and dig two holes 12 wide and 24 deep Connect the bottom leg with 2 1 1 4 x 3 8 button head bolt washer on top and lock nut on...

Страница 17: ...9 126 707BPS 3 8 x 1 1 2 Button head bolt 2 10 126 704 3 8 x 3 Button Pin Bolt 4 11 226 601 3 8 Nylon Lock Nut 8 12 196 807 3 8 x 3 8 Socket Set Screw 4 13 126 701 3 8 x 1 1 4 Button head bolt 8 14 12...

Страница 18: ...4 Pls Typ 2 Pls DETAIL F 20 17 2 5 17 18 DETAIL D Typ 4 Pls 52 45 8 912 282 912 282 912 282 912 282 5 4 3 2 1 SPIRAL SLIDE to 6 DECK SPIRAL SLIDE to 6 DECK SPIRAL SLIDE to 6 DECK SPIRAL SLIDE to 6 DEC...

Страница 19: ...le Now level the slide front to back and side to side sometimes this can be difficult to do because of the variances in the slides so also make sure it looks the guardrails This will be determined by...

Страница 20: ...heet 4 of 4 Sheet 4 of 4 Sheet 4 of 4 Sheet 4 of 4 Hardware Stainless steel tamper resisitant SPECIFICATIONS SPECIFICATIONS SPECIFICATIONS SPECIFICATIONS Event Slide is rotaitionally molded and deck i...

Страница 21: ...r faded contact your SportsPlay distributor for replacement labels Top of Surfacing Label Install one to each upright post at the level you have determined will be your Top of Surfacing based on fall...

Страница 22: ...installed and you have to move it Solution Using a punch simply knock the roll pin through the clamp and post then move the clamp Problem There is interference between a vertical portion of one compo...

Страница 23: ...ends sometimes rough handling will cause rough edges Sand down rough areas if they exist Check that screws are seated Vinyl coated parts check all areas to de burr Roll pins make sure they are flush a...

Страница 24: ...ir and could be hazardous Copy this page and explain R ratings on reverse side Equipment 36 deck Transfer station Crawl tunnel Alpha panel Guard wall with wheel Triple rail slide Slide guard Deck clam...

Отзывы: