background image

  
 

SEPTEMBER 21, 2010  

 

 

902-958 DUAL LEG PRESS STATION 

INSTALLATION INSTRUCTION 

Welds 

!

 

Inspect all welds for cracks.  If a 
crack is found block access to the 
playground and contact your 
distributor for replacement parts 
immediately. 

Hardware 

!

 

Inspect for loose or missing 
hardware.  Tighten all loose 
hardware and replace all missing 
hardware.  Block off access to 
equipment if necessary. 

Plastic Components 

!

 

Inspect for any sharp edges or 
deformities.  Minor deformities 
and sharp edges can be repaired 
using a utility knife.  Block off 
access until repairs are made.  
Contact distributor for 
replacement parts. 

Finish 

!

 

Inspect all metal components for 
coating damage.  If powder coating 
needs to be repaired sand surface 
and mask off area.  Coat with 
primer and once the primer has 
dried paint with color matching 
touch up paint.  Contact distributor 
of color matching paint.  Contact 
Distributor for Thermoplastic 
repair kit. 

Footings 

!

 

Inspect all footings to ensure 
equipment is secure.  You must block 
access to prevent access until repair is 
made. 

Replacement Parts 

!

 

Reference the parts list on page 2 of 
the instruction set for this component 
to identify the part/s correctly. 

!

 

Contact your distributor to order parts. 

 

MAINTENANCE 

!

 

THIS DOCUMENT WILL ACT AS 
YOUR ORIGINAL DOCUMENT 
AND COPIES SHALL BE MADE 
FOR USE DURING THE ACTUAL 
INSPECTIONS 

!

 

MAINTAIN A FILE WITH COPIES 
OF ALL INSPECTIONS AND 
MAINTENANCE RECORDS 
ALONG WITH THE 
INSTRUCTIONS 

Содержание 902-958

Страница 1: ...ight 271 lbs MAINTENANCE As the owner of the equipment you are responsible for maintenance of the equipment and the surrounding area A maintenance schedule must be developed and the equipment inspecte...

Страница 2: ...TION PARTS LIST ID DESCRIPTION QTY 1 Dual Leg Press 1 2 Footing Frame 1 3 Mounting Cover 2 pieces 1 4 Hex Nuts 4 3 8 x 2 Button Head Bolt 2 3 8 Flat Washer 2 7 32 Allen 1 NOTE Keep a copy of these ins...

Страница 3: ...n the next page as a reference It is the owner installers responsibility to check local building codes and to comply with those codes All footing depths listed here are recommendations and local soil...

Страница 4: ...ng OD WARNING THIS EQUIPMENT IS DESIGNED FOR HEALTHY PEOPLE AGE 13 AND UP INSTALLATION TIPS TROUBLE SHOOTING Installation of the equipment is easy since the equipment itself is already assembled Alway...

Страница 5: ...op plate is flush with the surface of the concrete After the concrete has cured install the equipment onto the footing frame by sliding the equipment into position and attaching with the nuts provided...

Страница 6: ...t all metal components for coating damage If powder coating needs to be repaired sand surface and mask off area Coat with primer and once the primer has dried paint with color matching touch up paint...

Страница 7: ...STED INCLUDE DATES AND SIGNATURES Inspection Checklist Recommended Frequency Grade Pass Fail NA Date Inspected Date Repairs Completed Inspect Hardware Weekly Inspect Plastic Components Weekly Inspect...

Отзывы: