background image

  
 

SEPTEMBER 21, 2010  

 

 

902-958 DUAL LEG PRESS STATION 

INSTALLATION INSTRUCTION 

INSTALLATION STEPS 

!

 

Once the footing has been dug place the frame in the hole.  
Level the top plate of the frame and poor concrete.  Make 
sure the top of the top plate is flush with the surface of the 
concrete.   

!

 

After the concrete has cured, install the equipment onto the 
footing frame by sliding the equipment into position and 
attaching with the 

!

” nuts provided. (Refer to the image on 

page 3) 

!

 

Next, install the mounting cover using the 3/8” x 2” bolts 
and 3/8” washers. (Refer to the image on the right side of 
this page) 

!

 

Inspect the equipment to make sure all parts are secure and 
operating properly. 

 

 

 

Содержание 902-958

Страница 1: ...ight 271 lbs MAINTENANCE As the owner of the equipment you are responsible for maintenance of the equipment and the surrounding area A maintenance schedule must be developed and the equipment inspecte...

Страница 2: ...TION PARTS LIST ID DESCRIPTION QTY 1 Dual Leg Press 1 2 Footing Frame 1 3 Mounting Cover 2 pieces 1 4 Hex Nuts 4 3 8 x 2 Button Head Bolt 2 3 8 Flat Washer 2 7 32 Allen 1 NOTE Keep a copy of these ins...

Страница 3: ...n the next page as a reference It is the owner installers responsibility to check local building codes and to comply with those codes All footing depths listed here are recommendations and local soil...

Страница 4: ...ng OD WARNING THIS EQUIPMENT IS DESIGNED FOR HEALTHY PEOPLE AGE 13 AND UP INSTALLATION TIPS TROUBLE SHOOTING Installation of the equipment is easy since the equipment itself is already assembled Alway...

Страница 5: ...op plate is flush with the surface of the concrete After the concrete has cured install the equipment onto the footing frame by sliding the equipment into position and attaching with the nuts provided...

Страница 6: ...t all metal components for coating damage If powder coating needs to be repaired sand surface and mask off area Coat with primer and once the primer has dried paint with color matching touch up paint...

Страница 7: ...STED INCLUDE DATES AND SIGNATURES Inspection Checklist Recommended Frequency Grade Pass Fail NA Date Inspected Date Repairs Completed Inspect Hardware Weekly Inspect Plastic Components Weekly Inspect...

Отзывы: