June 11, 2020
11
902-293 6’ IND. SECTIONAL SLIDE (VL)
INSTALLATION INSTRUCTIONS
INSTALLATION STEPS CONTINUED
__13)
Attach the Support Brace to the Slide:
Place the support
brace into its designated hole. Remove the nuts one at a time to
attach the support brace then reattach the nut.
Tighten.
See Detail
J.
__14)
Attach the Guard Walls to the Slide:
Using the holes in the
tabs n the guard walls, mark and drill a ½” hole for each tab and
insert a 3/8” Zip toggler (17) in each hole. To secure the tabs to the
slide, use two 2” bolts (14) and two 3/8” flat washers (10).
Hand
tighten only.
See Detail K.
__15)
Once full installation of all components is complete,
square, and level the entire structure.
Tighten all bolts.
Fill all
footing holes with concrete. Check area for any remaining tools or
hardware and secure the area with caution tape, etc. After the
concrete has been allowed to cure for 24 hours, backfill with dirt.
__16)
Inspect the components:
If sharp edges are found, file and
apply touch up paint.
Detail J
Detail K