January 29, 2019
4
511-146P ROPE CLIMB
INSTALLATION INSTRUCTION
Страница 1: ...required MAINTENANCE As the owner of the playground you are responsible for maintenance of the equipment and play area A maintenance schedule must be developed and the equipment inspected frequently A...
Страница 2: ...Rope 10 Long 1 2 503 100 2 3 8 Sliding Pole 1 3 585 520 2 3 8 Swing Hanger 1 4 345 506 D Shackle 1 5 317 140 1 4 0 Chain 1 6 317 140 3 4 0 Chain 1 7 105 017 2 3 8 Pipe Plug 1 8 345 905 Clevis Key for...
Страница 3: ...for this component is 1 higher than the surface grade of the main playground post you must dig your footing hole 1 deeper It is the owner installers responsibility to check local building codes and t...
Страница 4: ...January 29 2019 4 511 146P ROPE CLIMB INSTALLATION INSTRUCTION...
Страница 5: ...led and all components are square and level Identify and separate all parts by referencing the detail drawings and the parts list As you unpack and separate the components use the cardboard sheets tha...
Страница 6: ...e Sliding Pole will be 19 away from the 3 4 0 chain secure hole __5 Set Sliding Pole and 3 4 0 Chain After you have the footing dug you will need to place the Sliding Pole 2 in the footing hole You wi...
Страница 7: ...be 2 from the edge of the Sliding Pole See Detail A __7 Once the concrete has set back fill dirt over the footing holes inspect the area and components for tools hazardous debris and sharp edges Veri...