background image

  

 

March 2, 2016  

 

 

381-404H WHEELCHAIR SWING 

INSTALLATION INSTRUCTION 

 

INSTALLATION STEPS CONTINUED 

__10) 

Once the concrete has set

, back fill dirt over the footing 

holes; inspect the area and components for tools, hazardous debris 
and sharp edges.  Verify all components are installed and all 
hardware is tight and then install the safety surfacing. 

__11)  

Inspect the components:

 for sharp edges and if necessary 

file them down and apply touch up paint. 

 

 

 

 

 

Содержание 381-404H

Страница 1: ...HEELCHAIR SWING Installation Guide 1 INSTALLATION INSTRUCTIONS 381 404H ACCESSIBLE WHEELCHAIR SWING Please read the entire manual before beginning installation 3 CTN 5 PIPE 2 WF 10 TOTAL PCS 265 WEIGH...

Страница 2: ...381 404H WHEELCHAIR SWING Installation Guide 2...

Страница 3: ...381 404H WHEELCHAIR SWING Installation Guide 3 dm 04 30 20...

Страница 4: ...g them to the part list and component instruction pages Always compare the number of pallets cartons or other items the BOL has listed with the number actually received Note the any discrepancies on t...

Страница 5: ...esigned to install on a clear and level site There should be no more than 3 of grade variations in a 10 span Footing layout is the first critical step once the installation begins Mark all holes using...

Страница 6: ...n and Public Affairs Washington DC 20207 USA Call 1 800 638 2772 US and Canada only Call 301 504 0990 Direct Link http www cpsc gov For a copy of either the standard for surfacing ASTM F1292 or for pl...

Страница 7: ...digger Wheelbarrow Large construction bar 5 Claw hammer Large dead blow rubber hammer Small sledgehammer to use in blocking the posts Strong and sturdy step ladders Extension cords power supply Level...

Страница 8: ...sed immediately A maintenance section is included in the appendix of this instruction booklet If a part is missing or damaged the playground must be put out of service while the part is replaced Lack...

Страница 9: ...e 2 Once the structure is in the desired location within the play area mark the locations of the post by inserting a stake into the center of each post location see drawing below for an example If usi...

Страница 10: ...you may start installing concrete You must use concrete with a minimum of 2 500 psi 2 Always pre mix the concrete to the manufactures directions before pouring it into the hole Never put dry concrete...

Страница 11: ...at some point you may want to apply lubricating oil to the hardware Stainless steel hardware has a tendency to seize so if you are planning on removing the hardware you may want to apply lubricant to...

Страница 12: ...g from dangerous heights displacing of surfacing etc Inspecting for missing or broken equipment Do not allow children to play on broken equipment or equipment with missing components Keep children in...

Страница 13: ...removes the swing platform of secures it to the nearest support to prevent unsupervised mis use of the equipment Additionally it is recommended that a barrier be placed in front on the sides and behi...

Страница 14: ...IR SWING Installation Guide 14 X SET SCREW D SHACKLE 2 3 8 SWING HANGER 5 16 X 1 BUTTON HEAD NUT 5 16 X 2 BUTTON HEAD BOLT 5 16 LOCK WASHER 3 16 ALLEN WRENCH YELLOW BAG ALLEN WRENCH BLUE BAG 5 16 ALLE...

Страница 15: ...381 404H WHEELCHAIR SWING Installation Guide 15 COMPONENT INSTALLATION INSTRUCTIONS...

Страница 16: ...required MAINTENANCE As the owner of the playground you are responsible for maintenance of the equipment and play area A maintenance schedule must be developed and the equipment inspected frequently A...

Страница 17: ...ain ASM 1 3 383 416 HD Front Platform Chain ASM 1 4 186 403 x 1 Flat Head Screw 12 5 226 402 Lock Nut 12 6 342 506 D Shackle 2 7 416 500BPK 5 16 Socket Key 1 8 805 532 Warning Label 1 9 805 534 Sports...

Страница 18: ...382 408 HD WHEELCHAIR SWING PLATFORM INSTALLATION INSTRUCTION Note The swing hanger s pivot point to the ground should be 91 which will result an approximate 4 distance from the bottom of the platform...

Страница 19: ...until the unit is completely assembled and all components are square and level Identify and separate all parts by referencing the detail drawings and the parts list As you unpack and separate the comp...

Страница 20: ...x lock nuts 5 one Main Platform 1 one Back Platform 2 Place the back platform on top of the Main Platform then secure it with the bolts and lock nuts See Detail A __4 Attaching Front Platform to Main...

Страница 21: ...atform into an operational position __2 One person must hold the platform in position while the other person is placing the wheelchair on the platform __3 The long restraining chain must be unsnapped...

Страница 22: ...r added safety the long restraining chain can be positioned across the chest of the occupant The short restraining chain is then available as a Hand Hold for the occupant Both restraining chains have...

Страница 23: ...le who are bound to a wheelchair to swing This unit can cause serious injury if used in an un supervised area where other children are playing Should a child run into the use are of this product while...

Страница 24: ...d MAINTENANCE As the owner of the playground you are responsible for maintenance of the equipment and play area A maintenance schedule must be developed and the equipment inspected frequently A mainte...

Страница 25: ...506 D Shackle 2 6 196 802 x Socket Set Screw 6 7 116 545 5 16 x 2 Button Head Bolt 2 8 216 512 5 16 x 1 Button Head Nut 2 9 326 501 5 16 Lock Washer 2 10 416 350 3 16 Socket Key 2 11 416 500BPK 5 16...

Страница 26: ...ottom of the support post on a suitable flat blocking material to prevent it from sinking further into the soil We recommend you use a brick block of wood or several inches of gravel The footing depth...

Страница 27: ...April 8 2020 4 381 404H WHEELCHAIR SWING INSTALLATION INSTRUCTION ELEVATION AND FOOTING LAYOUT VIEW...

Страница 28: ...ake an adjustment It is recommended that you add a drop of oil to bolts that may have to be removed before you install them Do not tighten bolts all the way until the unit is completely assembled and...

Страница 29: ...correct position Assemble swing frame on side on ground If more than one section assemble section by section __4 Attach Swing End to Legs To do this you will need four 1 7 8 x 11 pipe 2 two swing end...

Страница 30: ...dig holes __8 Stand swing upright onto legs and brace in footing holes so that 2 3 of pipe will be under intended level of resilient surfacing and the top rail is at desired height Plumb and level en...

Страница 31: ...s set back fill dirt over the footing holes inspect the area and components for tools hazardous debris and sharp edges Verify all components are installed and all hardware is tight and then install th...

Отзывы: