March 2, 2016
7
381-404H WHEELCHAIR SWING
INSTALLATION INSTRUCTION
INSTALLATION STEPS CONTIUDE
__6)
Attaching Swing Hangers:
You will need two swing hangers
(4), two D Shackles (5). Assemble the D-shackles and the
wheelchair chain to the swing hangers. Attach the swing hangers to
the top rail. See (Detail C).
__7)
Dig footing holes:
Footing holes may be marked out and dug
from footing layout; however, it is easier to position swing in
proper location, mark holes, move swing aside, and dig holes.
__8) Stand swing upright onto legs and brace in footing holes so
that 2’ – 3’ of pipe will be under intended level of resilient
surfacing and the top rail is at desired height. Plumb and level
entire unit. Tighten all set screws.
__9) Once the entire playground has been installed and you have
verified that the entire playground is level you can
add the
concrete to the footing holes
. Be sure to use concrete with a
minimum 2,500 psi and mix the concrete per the manufacturer’s
directions before you pour it into the footing hole. Once the
footing has been filled with concrete you should rope of the area for
a minimum of 48 hours to allow the concrete set properly.
Содержание 381-404H
Страница 2: ...381 404H WHEELCHAIR SWING Installation Guide 2...
Страница 3: ...381 404H WHEELCHAIR SWING Installation Guide 3 dm 04 30 20...
Страница 15: ...381 404H WHEELCHAIR SWING Installation Guide 15 COMPONENT INSTALLATION INSTRUCTIONS...
Страница 27: ...April 8 2020 4 381 404H WHEELCHAIR SWING INSTALLATION INSTRUCTION ELEVATION AND FOOTING LAYOUT VIEW...