Sportable Scoreboards SSB-3328DSP Скачать руководство пользователя страница 3

 

3

 

 

8’ X 36’ SPECIAL OUTDOOR SCOREBOARD 

 

NOTE TO INSTALLERS: PLEASE RETURN THIS MANUAL TO THE INDIVIDUAL IN CHARGE OF 
THE SCOREBOARD UPON COMPLETION OF INSTALLATION. 

 

INSTRUCTIONS FOR REPORTING SHIPPING DAMAGE 

 

 

Shipping  damage  is  noted  at  the  time  of  delivery,  Consignee  must  note 

DAMAGED

” on the 

Delivery Receipt.  Please make notations of the type of damage to the freight and to the packaging.  
Ask  the  Delivery  driver  to  call  the  local  terminal  to  report  the  freight  damage  immediately.    The 
shipper is not responsible for the shipments that are not signed for as damaged upon arrival.  Please 
contact the manufacturer immediately to report the damage.  The shipper is responsible for filing the 
clam, unless shipped 3RD Party. 

 

The scoreboard and all accompanying accessories have been carefully inspected and tested before 
leaving the factory.  However, it is possible for damage to have occurred during shipping so we ask 
that you inspect all shipping containers upon arrival for damage and ensure that you have all of the 
parts listed below. If you find that damage has occurred during shipping: 1) accept the shipment from 
the carrier…

DO NOT

 refuse the shipment, 2) follow the instructions for filing a freight damage claim 

found below, and 3) notify the manufacturer immediately. 

 
If damage is discovered after delivery, call the delivery company to report the concealed damage 

and please call the manufacturer immediately to report the damage.   

Concealed damage must be 

reported  within  5  days  after  delivery  date.   

If  the  damages  are  found  after  this  time,  the 

manufacturer will not be responsible for damage. 

 

 

 

 

 

THE SCOREBOARD SYSTEM SHOULD INCLUDE THE FOLLOWING PARTS: 
 

 

ITEMS IN

 

LARGE PACKAGE(S) 

(7)

   

8’ X 28’ scoreboard; shipped in seven (7) sections 

(2)    

4’ x 8’ DSP-8 blank sponsor sections; shipped in two (2) sections each 

(4)      18

’ mounting angle irons and hardware (nuts, bolt, and washers) 

ITEMS IN BOX 

(1)   

Keyboard controller with (24) keypad inserts 

(1)  

12-volt DC wall transformer 

(1)  

Documentation CD (including installation, operation, maintenance, warranty, and                             

support information) 

     

Cable-controlled systems (standard): 

 

(1)   

20-ft. control cable 

           (1) 

Junction box cover with built-in receptacle 

           (1)      Customer-specified length of control cable (unless purchased from a separate vendor) 

 
 
 

 

 

 

INSTALLATION OVERVIEW 

 

Содержание SSB-3328DSP

Страница 1: ...1 INSTALLATION INSTRUCTIONS MODEL SSB 3328DSP...

Страница 2: ...IENTATION 4 INSTALLING THE MOUNTING POLES BEAMS 5 ASSEMBLING THE SCOREBOARD 6 MOUNTING THE SCOREBOARD 7 RUNNING CONNECTING THE CONTROL CABLE 9 At the scorekeeper s location 9 At the scoreboard 9 RUNNI...

Страница 3: ...below If you find that damage has occurred during shipping 1 accept the shipment from the carrier DO NOT refuse the shipment 2 follow the instructions for filing a freight damage claim found below an...

Страница 4: ...left section assembly to the mounting poles beams 6 Mount the right section assembly to the mounting poles beams 7 Connect wiring and install crossover bushings between cabinets C in the left section...

Страница 5: ...eet zero inches center to center with 20 6 of pole beam above ground refer to the installation diagram below If a sponsor panel is to be mounted above the scoreboard leave 23 6 of pole beam above grou...

Страница 6: ...d cabinet C on the right Align the cabinets so that they are flush across the top and bottom and the edges of the cabinets are touching Each cabinet is lettered A through G on the back 3 Using two of...

Страница 7: ...ctions should be made between cabinets before the access doors are replaced Inside each set of access doors connect all wiring harnesses between cabinets For each set of harness connections between sc...

Страница 8: ...seam between the first SPD 8 sponsor section and the second DSP 8 sponsor section should be centered on the far left I beam 3 Secure the scoreboard to the I beam using the mounting angle irons alread...

Страница 9: ...on the junction box cover using the crimp on butt connectors already attached to the leads on the junction box cover Connect the leads in the control cable to those on the junction box cover according...

Страница 10: ...terminal block regardless of the color s of the wires in the control cable that connect them 4 Re secure the signal power access door to the scoreboard NOTE Even if the control cable was not buried in...

Страница 11: ...ONNECTED TO THE SCOREBOARD A 120 VOLT CIRCUIT MUST ALSO BE INSTALLED IN A STANDARD DUPLEX OUTLET AT THE SCOREKEEPER S LOCATION FOR THE CONTROLLER S 12 VOLT DC WALL TRANSFORMER IF AN EXTERNAL BATTERY P...

Страница 12: ...will briefly display the controller s software version When the display changes and reads SELECT DIAG MODE DIGIT TEST press ENTER The LCD will now read SEGMENT TEST ALL SEGMENTS OFF Pressing the UP ar...

Страница 13: ..._____ Date Installation Completed _________________________________ Company or Person Responsible For Installation address phone number ________________________ This document confirms that the install...

Отзывы: