13
4. Installation of ground sockets and erection of the goal:
a)
First stick ground sockets on the uprights.
b)
Set mounted goal with ground sockets in the
foundations (800x800x1000mm). To enable a
drain off of possible water we recommend to
stick a tube below the holes of the ground
sockets.
c)
For adjustment of the goal use an auxiliary
construction (wooden bars) to keep the
goalframe in position while concreting and
hardening. Do not apply an accelerating mixture
or antifreeze as these adhesives may cause
damages of ground sockets. The goals can
always be taken out of the ground sockets.
5. Assembly of the net:
The net is not part of the delivery.
Make sure that the groove of the goal is clean and all packing material or other material
is removed so that the assembly is possible without any problems.
Now fix and adjust the net rope in the groove. Then stick net holders with its clips into
the groove and fix them with a 90° rotation. Fixing is either possible manually, with the
key for hexagon socket screws or with a pliers (see bottom pictures). Distribute net
holders equally (same distances).