78
Spohn & Burkhardt
3. Installation
Danger!
All tasks on the device are only allowed to be undertaken by specialist personnel taking
into account the relevant safety regulations. Always pay attention to the safety instruc-
Attention!
Avoid electrostatic charging while handling the devices.
3.1. Mechanical
installation
Danger!
The control stand is only allowed to be mounted on a suitable substructure.
Make sure the substructure has sufficient load-bearing capacity
Danger!
Transport the control stand using suitable hoisting equipment.
Figure 27.
8
13
13
13
13
240
16
R8
240
29
Mechanical installation – mounting base – example (dimensions in mm)
1. Disconnect the system from the supply of electrical power.
2. Position the control stand in the installation location, during this process pay attention to the cor-
rect minimum distance to neighboring parts. The rotating and swiveling area of the control stand
must not be blocked.
3. Fasten the control stand in the installation location using 4 suitable screws M14; 8.8 through the
fastening holes (
13
) in the mounting base (
8
) (tightening torque 138 Nm).
Содержание SV1C Series
Страница 48: ...48 Spohn Burkhardt 12 Konformitätserklärung ...
Страница 49: ...49 Spohn Burkhardt ...
Страница 50: ...50 Spohn Burkhardt ...
Страница 96: ...96 Spohn Burkhardt 12 Declaration of conformity ...
Страница 97: ...97 Spohn Burkhardt ...