Data di emissione:
December, 2013
Revisione:
1
Pag. :
59/68
Control and replacement of seals
BOWL GASKET (LOCATED AT THE REAR OF
BOWL)
Replace it every 12 months according to the
conditions of use and level of maintenance.
DISPENSE VALVE O-RING
The dispense valve O-rings should be replaced
as necessary when wear is evident. Lubricate
them each time they are replaced or the
dispense valve is removed for cleaning.
SUCTION GASKET
Replace every 3 months according to the
conditions of use and level of maintenance. This
part should be lubricated during the re-
assembly after every cleaning with Vaseline.
Winter storage
To protect the unit during seasonal shutdown,
it’s important to properly store the machine
using the following procedures:
- Disconnect all power to the freezer.
- Disassemble, wash and sanitize all parts that
come into contact with the mix as described in
chapter 10.
- Clean also all the exterior panels.
- Reassemble all these parts.
- Cover the machine with the original package
to protect it from dust or other contaminating
elements.
- Place the machine in dry location.
Product storage
Since the safety of the product used with this
unit depends upon the temperature and the
duration of storage, it is necessary to refer
directly to the food product producer instruction
and specifications in order to correctly manage
it and in order to avoid any possible safety
issue.
Содержание NINA1
Страница 62: ...Data di emissione December 2013 Revisione 1 Pag 62 68 15 WIRING DIAGRAM ...
Страница 63: ...Data di emissione December 2013 Revisione 1 Pag 63 68 ...
Страница 64: ...Data di emissione December 2013 Revisione 1 Pag 64 68 ...
Страница 65: ...Data di emissione December 2013 Revisione 1 Pag 65 68 ...
Страница 66: ...Data di emissione December 2013 Revisione 1 Pag 66 68 ...