background image

 

 

 

 

M a s c h i n e n f a b r i k   G m b H

 

 

Spitznas Maschinenfabrik GmbH, Fellerstr.4, D-42555 Velbert, Tel: +49(0)2052 605 0, Fax: +49(0)2052 605 29

, www.spitznas.de

 

Translation of the original manual 
compiled: 25.05.12 

224040010_30_40_BA_en_Version_01 

Page 1 of 13 

 

Pneumatic 

Rotary Hammer Drill 

Type 2 2404 0010 

 

2 2404 0030 

 

2 2404 0040 

Tech. Doc. No. 206 

 

 

 

 

Illustration can differ from the original 

 

Operation and 

Maintenance Manual 

 

Содержание 2 2404 0010

Страница 1: ...52 605 0 Fax 49 0 2052 605 29 www spitznas de Translation of the original manual compiled 25 05 12 224040010_30_40_BA_en_Version_01 Page 1 of 13 Pneumatic Rotary Hammer Drill Type 2 2404 0010 2 2404 0...

Страница 2: ...ng range in concrete 0 19685 1 102 inches dia 5 28 mm dia Drilling capacity in concrete of medium hardness 0 4728 dia 2 0853 cu in 11 82 inches min 12 mm dia 34 min 300 mm min Optimum drilling perform...

Страница 3: ...not wear loose clothing or jewellery it can be caught in moving parts Follow the general current and appropriate Accident Prevention and Safety Procedures Never work under the influence of alcohol dr...

Страница 4: ...e using the machine damaged parts or protective devices should be carefully checked to make sure they work soundly and fulfil the designated function Check alignment connections and attachment of movi...

Страница 5: ...on or modifications to the machine are not allowed Observe the instructions regarding the operation care and maintenance in the operation instruction Dangers can come from the machines and the auxilia...

Страница 6: ...e on the machine This will not increase its performance Just position the bit and guide it into the hole Placing the machine into the box Make sure the adjusting sleeve is locked at the setting rotary...

Страница 7: ...hold the machine by the adjusting sleeve and press it slowly against the work surface until it hammers weakly Hold and continue to drill the hole Switch off the machine briefly and relock the adjusti...

Страница 8: ...ce of the machines are decisively determined by a The air purity Blow the air hose clear before connecting it to the machine Install dirt and water separator upstream of the machine if it is not possi...

Страница 9: ...on must be carried out by service units or by manual hose oilers We recommend service units for permanently installed workplaces see accessories list However where longer hose lines are necessary line...

Страница 10: ...40010_30_40_BA_en_Version_01 Page 10 of 13 Greases free of resins and acids Multi purpose greases for antifriction and friction bearings Special greases for high speed miter gears Designation in accor...

Страница 11: ...tationary pneumatic machines and motors the lubrication is carried out by lined up oilers for horizontal or vertical installation Setting of oilers Shut off air supply Open plug item 3 Loosen visible...

Страница 12: ...authorized expert company d Other problems Contact authorized expert company D e c l a r a t i o n o f C o n f o r m i t y as defined in the European Union Machine Directive 2006 42 EC for usable mac...

Страница 13: ...ropean Union Machine Directive 2006 42 EC for usable machines We the company SPITZNAS Maschinenfabrik GmbH Fellerstra e 4 42555 Velbert Langenberg declare that the following product Description Pneuma...

Отзывы: