Spirotech SpiroVent Superior S600 Скачать руководство пользователя страница 12

13

English

User manual -  1.0

Set the date and time

1.

Move the wheels of the time indicator (HH:MM:SS) 
to the correct time in hours (HH), minutes (MM), 
and seconds (SS).

2.

Move the wheels of the date indicator (DD:MM:YY) 
to the correct date in day (DD), month (MM), and 
year (YY).

3.

Select the next page button ( > ).

4.

Open the valves. Refer to § 5.4.1.

5.

Deaerate the pump. Refer to § 5.4.1.

Set the pressure levels

1.

Drag the label of the maximum pressure (A) to the 
desired maximum pressure.

2.

For units of -R and -B versions:

 Drag the label of 

the operating pressure (B) to the desired operating 
pressure.

3.

For units of -R and -B versions:

 Drag the label of 

the refill pressure (C) to the desired refill pressure.

4.

Select the confirm button ( 

  ).

Start the degassing process

1.

Select the degassing button. The button indicator 
light comes on.

2.

Select the home button to go to the home screen.

5.4.3

Check operation

1.

Check the indication of the pressure gauge (B). This 
should alternately display overpressure and 
underpressure.

2.

Close the valve (A) behind the pressure gauge.

3.

Put back the cover (C) on the unit and fasten it with 
the two bolts (D).

6

OPERATION

6.1

HMI (user interface) description

This section shows an overview of the content on the 
display.

6.1.1

Screen layout

A

Date and time indicator

B

Operating mode indicator

NOTE

The minimum operating pressure (D) cannot 
be changed.

NOTE

In case the unit is not filled to at least the 
minimum operating pressure (2.1 bar for 
S6), the degassing process will not start and 
you will get a error message. Refer to § 7.5.

D

B

C

A

NOTE

The SmartSwitch will automatically turn 
off the unit when the concentration of 
dissolved gases has reached the minimum 
level.

D

C

D

B

A

B

C

A

D

E

   

Standby

   System pressure: xxx bar

  

Содержание SpiroVent Superior S600

Страница 1: ...part of this manual may be duplicated and or made public through the Internet by means of printing photocopying microfilm or in any other way without prior written permission from Spirotech bv This m...

Страница 2: ...valve 12 Pressure sensor 13 Y filter 14 Flow limiter inlet 15 Level switch 16 Check valve of the outlet 17 Pump 18 Control unit HMI 19 Cooling channel 20 Cover 21 Inlet connection 22 Outlet connectio...

Страница 3: ...letter indications correspond with the main figure on the previous page S600 3 4 4 4 7 3 8 10 17 16 21 22 23 14 13 11 12 28 26 24 25 15 5 S600 B S600 R M PS LS PT PI M PS LS PT PI FT M PS LS PT PI FT...

Страница 4: ...and of external equipment e g expansion systems The refill process consists of a vacuum phase where fresh fluid is sucked into the vessel 6 system valve 11 closed refill valve 24 opened This is follow...

Страница 5: ...ection class E System pressure F System temperature G Serial number H Year of construction I Weight SPIROVENT SUPERIOR Article No Type Power input Voltage Frequency IP class Pressure PS Temperature TS...

Страница 6: ...B System pressure bar 2 5 6 2 5 6 2 5 6 Processing capacity l h 1000 1000 1000 Max system volume m3 325 325 325 System temperature C 0 90 0 90 0 90 Ambient temperature C 0 40 0 40 0 40 Refill pressure...

Страница 7: ...installed in the main return line of the installation Make sure that the expansion system has the proper dimensions The water displacement in the unit can cause pressure variations in the installation...

Страница 8: ...ble to mount the unit to the floor Use brackets and adequate fasteners A 3 Under condensing circumstances It is possible to remove the plug from the drain hole B Use a 1 adapter to connect the unit to...

Страница 9: ...e unit can be isolated Keep valves closed until the unit is installed and taken in operation Refer to 5 4 A D B C A B C CAUTION Use a locally approved backflow protection A backflow protection can als...

Страница 10: ...crews B 7 Fasten the connector cap B to the connector C 8 Put back the connector in the frame 9 Fasten the cable gland A i 10 If an external contact external refill common fault and or boiler interloc...

Страница 11: ...4 2 First startup 1 Connect the unit to the mains power Select the language 1 Select your preferred language The indicator shows the selected language 2 Select the next page button CAUTION Make sure...

Страница 12: ...button The button indicator light comes on 2 Select the home button to go to the home screen 5 4 3 Check operation 1 Check the indication of the pressure gauge B This should alternately display overpr...

Страница 13: ...start Critical system fill Critical system fill Selection wheel Range indicator with movable labels Page Content Start On off button Home Actual unit state refer to 6 1 4 Actual system pressure Unit i...

Страница 14: ...tical error has occurred Page Content Parameter Description Date and Time The actual date and time Auto degass time 1 Time setting for daily start time and stop time of the degassing process Auto dega...

Страница 15: ...l be started to bring the system to the refill pressure again In this manual refill cycle the pump will be switched on and off and the refill valve will stay open 6 8 Various remarks When the unit is...

Страница 16: ...the drain connection E 6 Drain the unit through the drain connection 7 Open the air vent screw on the main pump to completely empty the unit Refer to the figure in 5 4 2 7 4 Resetting the unit 1 At th...

Страница 17: ...in the installation Make sure that the system pressure is above 2 5 bar There is a leak in the installation Repair the leak The inlet valve is closed Open the valve The pressure sensor 12 is defectiv...

Страница 18: ...ms with the refill functionality S600 R S600 B Problem Possible cause Correction W10 E10 Refill flow too low A valve in the refill inlet line is closed Open the valve The solenoid valve 24 does not op...

Страница 19: ...7 Pump 50Hz R15 328 17 Pump 60Hz R16 801 17 Capacitor 50Hz R15 789 17 Capacitor 60Hz R15 791 17 Seal set R15 731 Frame and cover Cover S600 R73 255 Control unit 2 HV Box R61 524 18 Brain R61 525 Conne...

Страница 20: ...nsor 15 Level sensor R11 559 Hoses 22 Inlet hose system to unit R73 352 21 Outlet hose unit to system R73 354 23 Refill inlet hose break tank B versions R61 402 23 Refill inlet hose mains R versions R...

Страница 21: ...ician Initials Nature of the maintenance Inspection date Technician Initials Nature of the maintenance Inspection date Technician Initials Nature of the maintenance Inspection date Technician Initials...

Страница 22: ...e guarantee for Spirotech products is valid until 2 years following the purchasing date The guarantee lapses in cases of faulty installation incompetent use and or non authorised personnel trying to m...

Страница 23: ...iroVent Superior models S4 S400 S6 S600 S10 and S16 all types Are in compliance with all relevant demands of the following European Direc ves Machine Direc ve 2006 42 EC Low Voltage Direc ve 2014 35 E...

Отзывы: