![Spirit SPT0034- XE195 Скачать руководство пользователя страница 10](http://html1.mh-extra.com/html/spirit/spt0034-xe195/spt0034-xe195_owners-manual_1348251010.webp)
8
PLASTIC PARTS ASSEMBLY
1.
Mate the Connecting Arm Covers (57 & 58) on the joint where the Connecting Arms (8, 9)
are joined to the Swing Arms (10, 11). Fasten together with two Phillips Head Screws
(105) and one Sheet Metal Screws (87) on each joint. Tighten with the Short Phillips Head
Screw Driver (107).
2.
Fasten the two Wheel Covers (52) to the roller sets (39) with four Phillips Head Screws
(105). Tighten with the Phillips Head Screw Driver(108).
3.
Attach the left side cover (19) and right side cover (20) to the mid-stabilizer tube with two
Phillips Head Screws (105). Attach the right side cover (20) and left side cover (19) to
the rear stabilizer tube with two Phillips Head Screws (105). Tighten all four screws
with the Phillips Head Screw Driver (108). Then attach the Front Stabilizer Cover (49)
with two Phillips Head Screws (105). Tighten with the Phillips Head Screw Driver (108).
4.
Install the Front Handle Bar Covers (L & R) (54 & 55) and Rear Handle Bar Covers (L & R)
(54-1& 55-1) over the Handle Bars axle connections with four Sheet Metal Screws (87)
on each side. Tighten with the Phillips Head Screw Driver (108).
5.
Look closely at the four floor levelers underneath the middle and rear of the elliptical. If any
of these aren’t in contact with the floor, use the wrench (124) to loosen the bottom nut.
Once the nut has been loosened, turn the rubber pad clockwise until it makes solid
contact with the floor. Retighten the bottom nut to prevent it from moving.
HARDWARE
#87. Ø 3.5 × 12mm
Sheet Metal Screw (8 pcs)
#105. M5×15mm
Phillips Head Screw (14 pcs)
4
Содержание SPT0034- XE195
Страница 20: ...18 EXPLODED VIEW DIAGRAM...