3.531.5275.200
6
Steam Mains - Do’s and Dont’s:
Prevention of tensile stressing
Pipe misalignment:
Installing products or re-assembling after maintenance:
Do not over tighten.
Use correct torque figures.
Flange bolts should be gradually tightened across
diameters to ensure even load and alignment.