![Spirax Sarco GXM16Z Скачать руководство пользователя страница 3](http://html1.mh-extra.com/html/spirax-sarco/gxm16z/gxm16z_installation-and-maintenance-instructions-manual_1347927003.webp)
3.531.5275.200
3
A products’ safe operation is assured when they are properly installed, commissioned, used and
maintained by qualified personnel (see section 11 of the present instruction paper) according to the
operation instructions.
Compliance with installation and safety general instructions must also be observed during piping
and plant assembly together with an appropriate use of safety equipment and facilities.
1.1 Intended use
Referring to Installation and Maintenance Instructions, Name Plate and Technical Information Sheet,
check that the product is suitable for the intended use/application. The products listed below comply
with the requirements of the European Pressure Equipment Directive 97/23/EC and carry the mark,
when so required. The products fall within the following Pressure Equipment Directive categories:
Valve type
PN DN
Gas Gas Liquid Liquid
Group 1
Group 2
Group 1
Group 2
GXMZ
16
½" - 2"
-
SEP
-
SEP
GXM16Z
16
15 - 50
-
SEP
-
SEP
65 - 100
-
1
-
SEP
RJ216Z
16
15 - 50
-
SEP
-
SEP
65 - 100
-
1
-
SEP
RJ205N
16
½" - 2"
-
SEP
-
SEP
RJ205Z
16
½" - 2"
-
SEP
-
SEP
SEP = not subjected to marking as per Para 3.3 of Directive 97/23/EC.
I) The products have been specifically designed for use on steam, compressed air, water /
condensate, dyatermic oil or other fluids that are in Group 2 of the above mentioned Pressure
Equipment Directive. The products’ use on other fluids within Group 2 may be possible but, if
this is contemplated, Spirax Sarco should be contacted to confirm the suitability of the product
for the application being considered.
II) Check material suitability, pressure and temperature and their maximum and minimum values.
If the maximum operating limits of the product are lower than those of the system in which
it is being fitted, or if malfunction of the product could result in a dangerous overpressure or
overtemperature occurrence, ensure a safety device is included in the system to prevent such
over-limit situations.
III) Determine the correct installation situation and direction of fluid flow.
IV) Spirax Sarco products are not intended to withstand external stresses that may be induced
by any system to which they are fitted. It is the responsibility of the installer to consider these
stresses and take adequate precautions to minimise them.
V) Remove protection covers from all connections and protective film from all name-plates, where
appropriate, before installation on steam or other high temperature applications.
1.2 Access
Ensure safe access and if necessary a safe working platform (suitably guarded) before attempting
to work on the product. Arrange suitable lifting gear if required.
1.3 Lighting
Ensure adequate lighting, particularly where detailed or intricate work is required.
1.4 Hazardous liquids or gases in the pipeline
Consider what is in the pipeline or what may have been in the pipeline at some previous time.
Consider: flammable materials, substances hazardous to health, extremes of temperature.
1. General safety information
Содержание GXM16Z
Страница 2: ...3 531 5275 200 2...