background image

- The Dimension of Multifunction valve & The Inlet/Outlet

  Pipe is 1/2” BSP

- Connection of Multifunction Valve: Install the

   Multifunction Valve with The heater on The Inlet of The 

   Water Heater

- Ensure Inlet Water Pressure between 0.1 Bar to 8 Bar

  (Maximum). Incase of High Water Pressure, Use an

   Appropriate Pressure Reducing Valve. Minimum Inlet

   Pressure of 0.1 bar (1m Water Head) is required for

  Water to Enter the Tank.

- If the Users want to realize a Multi- Way Supply System

  refer to the method shown in 

Fig.3 

Connection of the

  Pipelines.

- First, Open any one of the Outlet Valves at the Outlet

  of The Water Heater, Open the Inlet Valve. The Water

  Heater gets filled with Water. When water flows out of

  the Outlet pipe it Implies that the Heater has been filled

  fully with Water, and the Outlet valve can be closed.

Note: During normal Operation, the Inlet valve shall be

always kept open.

 

- Insert the supply plug into the supply socket, and

CONNECTION OF PIPELINES

MULTI OUTLET CONNECTION

Connection of Pipelines

Connection of Pipelines

Содержание CYLENDRO MGL I

Страница 1: ...eri Kurla Road Andheri East Mumbai 400093 18001202700 9833002020 WEEE ENVIRONMENTAL PROTECTION Disposal of Electrical and Electronic Equipment Do not dispose of this product with household waste For it s proper treatment recovery and recycling please take this product to the appropriate waste collection point If you are unsure where this may be please contact your local authority Improper disposal...

Страница 2: ...e Adjustable Knob 3 Water Inlet Please read and follow all the instructions given in this use and care manual carefully before using your Spherehot Cylendro MGL I to get the best mileage and trouble free operation FEATURES OF THE CYLENDRO MGL I ...

Страница 3: ...box There should be some distance between the unit and the roof This is to ensure that the unit can be removed easily when required The unit should also be saved from damaged due to splashing water For this keep a minimum distance of 1 2m between the floor and bottom of the heater The water heater must be connected to the water mains by new detachable hose pipes Old hose sets should not be used Al...

Страница 4: ...nk If the Users want to realize a Multi Way Supply System refer to the method shown in Fig 3 Connection of the Pipelines First Open any one of the Outlet Valves at the Outlet of The Water Heater Open the Inlet Valve The Water Heater gets filled with Water When water flows out of the Outlet pipe it Implies that the Heater has been filled fully with Water and the Outlet valve can be closed Note Duri...

Страница 5: ...ear a load of more than two times the heater when fully filled with water Other strengthening measures must be adopted in case of distortion and cracks The multifunction valve attached to the heater must be installed at the cold water inlet This valve performs the function of pressure release vacuum release non return and drainage When using the heater for the first time or during first use after ...

Страница 6: ... If any parts and components of this electrical water heater are damaged please contact Spherehot customer care center for repair MAINTENANCE Check the power supply plug and socket frequently to make sure that they have good reliable contact and are well grounded without overheating If the heater is not used for a long time especially in regions with low atmospheric temperature lower than 0 C the ...

Отзывы: