WARNING

Collapsing excavation walls can cause injury 
or death. Do not enter the wetwell excavation 
unless necessary and in compliance with 
OHS regulations. Follow OHS guidelines for 
excavations.

WETWELLS

• 

Lower Wetwell onto Compacted Base then place 
Wet concrete around the Unit covers 2 x Ribs plus 
meets the Ballast Quantity in (table 1 and figure 1).

Cold concrete joints are not allowed. Fibreglass solid 
bot- tom wetwells with external reinforcing ribs must 
be installed in a continuous and monolithic concrete 
pour. Concrete must extend 75mm above the second 
rib from the wetwell bottom, and around the entire 
circumference of the wetwell. (Refer to figure 1.)
• 

Concrete slab must fill all gaps and voids in and 
around the external tank reinforcing ribs.

• 

It may be necessary to add ballast (water) inside 
the wetwell to counteract buoyancy until the 
concrete is cured.

ANTI FLOATATION RING CONCRETE SLAB

Use minimum 20 mpa concrete for anti floatation 
and ballast Final concrete depth, size, thickness and 
reinforcements shall meet the minimum requirements 
in these instructions and applicable tables. Anti 
floatation ring should extend a minimum of (refer to 
table 1) in all directions from the wetwell outer diameter.

CAUTION

Voids in the concrete slab around external 
structural anchors will result in product damage 
and environmental contamination.

A. HANDLING & 

PREPARATION

WARNING

Do not stand on or under wetwell while it is being 
lifted. This could result in personal injury or death.

• 

Do not drop or impact the wetwell.

• 

Wetwells should be stored horizontally and 
chocked, using only appropriate materials such as 
sandbags, tires, or other soft or pliable materials.

• 

Upon wetwell delivery and when lifting wetwell, 
visually inspect entire exterior surface of the 
wetwell for shipping or handling damage.

• 

If the wetwell must be moved by rolling, ensure 
that ground to be traversed is smooth and free of 
rocks, debris, or other hard objects.

• 

Do not roll or set the wetwell on any pipe stubout, 
accessory or appurtenance installed on the 
wetwell.

• 

The contractor is responsible for rigging, unloading 
and securing the wetwell.

• 

When lifting the wetwell in the horizontal position, 
use two slings with a spreader bar.

• 

Use a minimum of two lift lugs when pivoting the 
wetwell from horizontal to vertical.

• 

Utilize all lift lugs provided at the wetwell top for 
vertical lifting.

• 

Only a pliable strap or rope should contact the 
wetwell, do not use chains, steel cables or hard 
metallic slings.

!

B. SITE 

PREPARATION

Dimensions of the excavation should be wide enough 
to provide sufficient working room around the wetwell.
Minimum anti floatation ring and ballast dimensions are 
speci- fied in (table 1).

Anti floatation ring and ballast designs in (Table 1) meet 
Australian Standard Code S3600A.

(Dead load resisting floatation have a factor of safety of
0.9 applied.)

C. ANTI  

FLOTATION 

BALLAST FRP 

WETWELLS

!

!

Содержание Vortceptor

Страница 1: ...SPEL Vortceptor spel com au Installation Manual ...

Страница 2: ...y of all the individuals involved in the installation To prevent wetwell damage and or failure which could lead to product loss and environmental contamination To validate the wetwell warranty GENERAL INFORMATION WARNING Wetwells are a confined space per OHS guidelines Follow proper confined space safety procedures SPEL fibreglass wetwells are designed for installation with concrete top pad and bo...

Страница 3: ...tank YES NO Install a 150mm thick compacted base This can be either a concrete blinding or compacted crushed rock layer YES NO Lower the Vortceptor into the excavation ensure no rocks or sharp objects fall into the hole and damage the tank YES NO Level and adjust the Vortceptor to suit the main drain pipework and the Diversion Chamber inlet void The invert levels of the inlet and outlet pipework i...

Страница 4: ...DS bit to drill the bolt holes YES NO Use M8 x 100mm Galvanised screw bolts to fix the Vortceptor to the Diversion Chamber YES NO Associated Drainage Finishing Works Install upstream and downstream drainage pipework YES NO Connect the pipework by others to the Diversion Chamber concrete bandage the inlet and outlet pipes to the Diversion Chamber YES NO Internally render the inlet and outlet pipewo...

Страница 5: ...ntal contamination A HANDLING PREPARATION WARNING Do not stand on or under wetwell while it is being lifted This could result in personal injury or death Do not drop or impact the wetwell Wetwells should be stored horizontally and chocked using only appropriate materials such as sandbags tires or other soft or pliable materials Upon wetwell delivery and when lifting wetwell visually inspect entire...

Страница 6: ...are significant and are based on the method of construction not the measured densities Dumped means that there is absolutely no compaction of the embedment soil Slight means there was something done that increased the soil density even if minor such as water settling jet ting flooding equipment travel and in some cases foot traffic For stable soils cohesion 36 kpa and or a bearing capacity 170 kpa...

Страница 7: ...as an underground fibreglass tank the backfill around the wetwell must also meet the tank backfill requirements so as to not compromise the tank installation Tank backfill requirements are more restricted and strict conformance to the tank backfill requirments in MAN 600 must be met for both the wetwell and tank F PIPING PENETRATIONS FITTINGS CAUTION Always wear safety glasses and protective cloth...

Страница 8: ...ned to be self supporting after cured The pad shall be specified by the Certified Engineer FIBREGLASS FLAT TOPS WITHOUT TRAFFIC LOAD See Figure H 1 The pad must be larger than the wetwell a minimum of 300mm in all directions Maximum 200mm concrete pad thickness FIBREGLASS FLAT TOPS WITH TRAFFIC LOAD See Figure H 2 The pad must be larger than the wetwell a minimum of 600mm in all directions The Cer...

Страница 9: ...spel com au 9 ...

Страница 10: ...10 Installation Manual Vortceptor ...

Страница 11: ...in minimum water level Add a minimum of 300mm of well placed backfill material MUST be crushed gravel to the hole and level the bed to assure uniform bottom support for the tank Position the tank in the hole Partially ballast tank using water until it settles firmly on the prepared bed Ballast level in a tank must never exceed water level in hole during installation Use only enough ballast to sink...

Страница 12: ...ab Thickness mm Required Ballast Extension Around Wetwell mm Ballast Height mm 1200 1 1800mm Dia N12 400 200 300 400 1520 1 1920mm Dia N12 500 200 350 500 1850 1 2250mm Dia N12 1 2650mm Dia N12 550 200 400 600 2200 1 2600mm Dia N12 1 3000mm Dia FN12 700 200 500 700 2470 1 2900mm Dia N16 1 3300mm Dia N16 800 250 500 800 3000 1 3400mm Dia N16 1 3800mm Dia N16 900 300 700 1000 3500 1 3900mm Dia N20 1...

Страница 13: ...spel com au 13 ...

Страница 14: ...A OFFICE 9 Hampden Road Mount Barker SA 5251 P 1300 773 500 E sales spel com au WA OFFICE 2 Modal Crescent Canning Vale WA 6155 P 61 8 9350 1000 P 1800 335 550 E sales spel com au NZ OFFICE AUCKLAND 100 Montgomerie Road Airport Oaks P 64 9 276 9045 E sales spel com au NZ OFFICE WANGANUI 43 Heads Road Wanganu New Zealand P 64 6 349 0088 E sales spel com au NZ OFFICE WELLINGTON 41 Raiha St Porirua W...

Отзывы: