background image

Speidels Braumeister

 

Page 15 of 32 

 
 

After  the  malt  has  been  added,  set  the  valve 
position  as  shown  in  the  illustration  on  the  left-
hand  side.  Caution:  When  using  the  200  L 
Braumeister,  the  pressure  inside  the  malt 
pipe/pressure  line  must  not  exceed  0.2  bar.  When 
using the 500 L/ 1000 L Braumeister, the pressure 
inside  the  malt  pipe/pressure  line  must  not  exceed 
0.15  bar.  This  will  prevent  the  malt  to  coagulate, 
cause  the  recirculation  to  be  reduced,  and  may 
damage  the  screen  plates.  Set  the  speed  controller 
to  pos.  7-8  to  ensure  the  optimum  pressure. 
However,  the  pressure  should  conform  with  the 
pressure  inside  the  pump  since  that  pressure  also 

depends on the 

amount of malt, size of grain, and recipe. 

 
Once  you  have  filled  the  malt,  acknowledge  it  by 
pressing  the 

Select

  button.  For  safety  reasons,  you  will 

receive the prompt “Malt filled?” And by pressing 

Select

 

the  actual  brew  process  commences  with  the 
Braumeister.  The  pump  and  the  heating  switch  on.  The 
wort  rises  up  in  the  pipe  and  overflows.  The  cycle  has 
begun  and  the  malt  is  washed  out  by  means  of  transfer 
pumping in the next phases. 
 

 

Protein rest: 
In  the  protein  rest,  the  large  protein  molecules  in  the  malt  are  split  into  small 
components. Protein rest is important for purification and full body, but especially for 
foam  stability  and  carbon  dioxide  binding  capacity  of  the  beer.  The  temperature  is 
around  52°C,  and  is  maintained  for  0-10  minutes,  depending  on  the  recipe 
programmed. In order to achieve a better stability of the foam, some recipes omit this 
phase. 

 
The  display  now  indicates  the  rest,  target,  and  actual 
temperature,  and  the  target  and  actual  time.  After  the 
target  temperature  has  been  reached,  the  countdown 
starts. All other phases are processed fully automatically. 
The  display  indicates  in  the  respective  times  and 
temperatures. 
 
By pressing in the 

Abort

 button, the brewing process will 

be interrupted. Subsequently, a prompt will be displayed 

asking whether the Automatic process shall be continued or if the entire process shall 
be cancelled. During this time, the red light is blinking. 
 
Maltose rest: 
In  the  second  phase,  the  maltose  rest,  starch  molecules  are  converted  to  fermentable 
sugar  with  the  help  of  additional  enzymes  present  in  the  malt.  This  phase  is  an 

Malt filled in?

Continue with

Temp

38/ 38.0

 

C

Set/ Actual

Automatic2 > Mashing

11:45

Abort

Select

H

P

Time     30/ 12.11min

Set/ Actual

Temp

63/ 55.5

 

C

Set/ Actual

Automatic2 > Step 2

11:45

Abort

P H

Содержание Braumeister 1000 L

Страница 1: ...Translation from the German Original Operating manual brewing instructions Speidels Braumeister Item No 45200 46500 4100 Issue October 2018...

Страница 2: ...ner lid 10 11 5 Information pertaining to the piping layout and the position of the valves 10 11 6 Lifting equipment information 10 11 7 Notes on hygiene 11 11 8 Information about the cooling jacket a...

Страница 3: ...st satisfaction and has a long lifespan Conformity declaration SPEIDEL Tank und Beh lterbau GmbH hereby declares that the Braumeister product mentioned in these instructions and to which this declarat...

Страница 4: ...ensation on the underside of the lid flows back into the container For this hold the lid over the container at an angle Scalding risk The Braumeister always operate via a residual current circuit brea...

Страница 5: ...and scope of delivery Please refer to the following illustration for components and scope of delivery Note The following illustrations refer to Braumeister 200 L however the instruction for the Braume...

Страница 6: ...with speed control Power connection 400V Min fuse protection 32 Amp Total connection 18 4 kW Cooling system Double walled shell area 1 8m plus cooling spiral included in delivery Contents Brewing qua...

Страница 7: ...aning process Once in a while hoses pipes must be removed and cleaned using a separate brush When cleaning the brewing vessel ensure water spray or moisture does not comes in contact with the electric...

Страница 8: ...es Hoisting equipment Visual inspection for damage According to hoisting equipment instructions Geared winch for tilted position Item No 78030 Lubrication according to separate instructions Hoses Item...

Страница 9: ...g recipe The arrow keys allow you to modify any entries Use the Select key to move to the next recipe item until you have reached the end Once all items of the recipe have been acknowledged by pressin...

Страница 10: ...pump s pressure gauge during the mash process In order to prevent excessive pressure in the malt pipe a pressure of 0 2 bar or 0 15 bar must not be exceeded The pump output is limited to approx 0 25 b...

Страница 11: ...ew drops or a little residue of the sulphurous acid in the beer is completely harmless Storage and maturation vessels are disinfected in the same way as fermentation vessels Where the beer is filled i...

Страница 12: ...beer enjoyed by gentlemen and ladies 12 2 Preparations Procuring the ingredients Organise the required brewing ingredients hops malt and yeast in good time Ensure that the malt is fresh After crushing...

Страница 13: ...the menu bar You may program up to 5 resting periods If a resting period is not required simply program it with 0 minutes Three batches of hops with the same time before the end refers to the time of...

Страница 14: ...ignal will be sounded and the lights will be blinking This must be acknowledged by pressing the Select button This switches the pump off Now follow the instructions on the brew control The malt pipe c...

Страница 15: ...protein rest the large protein molecules in the malt are split into small components Protein rest is important for purification and full body but especially for foam stability and carbon dioxide bind...

Страница 16: ...ownish red or yellow sufficient saccharification has taken place Where this is not the case the last temperature level must be maintained for a longer period 12 5 Purification After completion of the...

Страница 17: ...nd the temperature of this phase As the target temperature of 100 C cannot always be reached timing starts after a waiting period of 5 minutes without increase in temperature When pressing the Select...

Страница 18: ...m of pellets or dried hop blooms only in a hop bag The bitter substance content in beers is indicated in bitter units BU and is around 10 20 BU in wheat beers and 25 45 BU in Pilsners The bitter subst...

Страница 19: ...the fermentation vessel Caution First the water at the outlet of the wort cooler is still close to boiling temperature scalding risk This water can be re used for cleaning activities at a later stage...

Страница 20: ...r is started by the activity of beer yeast organisms which causes the fermentable sugar to be converted into alcohol and carbon dioxide After adding the yeast immediately seal the container with a lid...

Страница 21: ...ored and cooled wort to the unmatured beer in the fermentation vessel Do this 1 2 hours prior to the bottling stage This allows whirled up trub to settle again Attach a pipe that reaches the base of t...

Страница 22: ...Braumeister and store it in a suitable place Install power supply and provide hoses for fresh water and drain water Also clean all additional equipment required such as malt shovel wooden spoon wort h...

Страница 23: ...cycle has begun The next brewing phases take place fully automatically as programmed During some of the brewing phases the control causes a short pump break to reposition the malt The display shows t...

Страница 24: ...batch of hops 100 g or 150 g or 300 g in order to clear the wort from the hot trub and to ensure a rapid cooling process use a hos to connect the pump to the drain valve see detailed instructions To...

Страница 25: ...Speidels Braumeister Page 25 of 32 Cheers Additional recipes can be found here www speidels braumeister de...

Страница 26: ...does not start Check whether pump is operating and vented Check even positioning of malt pipe on vessel base and proper sealing Wort flows too slowly or not at all during purification Use wooden spoon...

Страница 27: ...e with notification prior to starting the first brewing procedure The following is stipulated in the Ordinance on the Implementation of the German Beer Tax Law BierStV and applies only to German hobby...

Страница 28: ...rt content measurement Plato Litres TARGET wort content measurement Plato Litres Wort boiling Total duration 1 Hop addition 2 Hop addition 3 Hop addition Filtering Cooling Wort removal Bottling Wort c...

Страница 29: ...add water until the heating coils are submerged several centimetres below the water level Now heat the water to 30 C During this process the water is recirculated Add a small amount of Halapur alkali...

Страница 30: ...ray the Braumeister with water Electrical components must come in contact with water When cleaning the exterior of the Braumeister ensure to disconnect the power Best cleaning results can be achieved...

Страница 31: ...ear of the device Guarantee claims are also excluded in terms of brittle components or expendables such as seals or similar Finally guarantee claims are excluded where work is performed on the device...

Страница 32: ...rst r behaga dig s kontakta din lokala terf rs ljare da Hvis anvisningerne ledsager v re p et sprog de forst r s du bedes kontakte din lokale forhandler it Se le istruzioni che accompagnano in una li...

Отзывы: