LOCk N LOAD PLUS
- SHIELD REPLACEMENT SYSTEM
CHIN BAR OPERATION: OPEN
CHIN BAR OPERATION: CLOSE
*ENSURE CHIN BAR IS SECURED PROPERLY BEFORE RIDING.
SINGLE ACTION CHIN BAR RELEASE
1. LOCATE SwITCH AT THE BOTTOM OF THE CHIN BAR.
2. PULL SwITCH DOwN TO DISENGAGE CHIN BAR.
3. PULL UP ON CHIN BAR UNTIL IT REACHES MAXIMUM OPEN POSITION.
1. GRAB THE CHIN BAR FROM IT'S OPEN POSITION, AND PULL DOwN UNTIL IT
LOCKS BACK INTO CLOSED POSITION.