7 | Operation
Spectron Gas Control Systems GmbH
18
GES_LT2000_0122
5. Open the process gas source valve, build up pressure, and close it again. Check using leak
test spray whether the process gas port is leak-tight.
6. Slowly open the gas source valve.
The pressure regulator is ready for supply.