5 Installation
5.1 General information
CAUTION
Injury or damage in the event of incorrect assembly or disassembly
Special steps are required for assembly and disassembly work on the product. Personal injuries
and damage to the product are possible.
a) Assembly and disassembly work may only be carried out by the installation engineer or ap-
propriately skilled specialist companies and persons.
b) The product is not permitted to be re-used following disassembly. All components must be
disposed correctly.
Depending on the type of gas, different requirements apply to the installation space of gas sup-
ply systems. It is essential to observe the legal regulations and trade association regulations,
and the information in the safety data sheets.
Familiarise yourself with the necessary work steps (see "
the necessary tools.
5.2 Installation work
5.2.1 Connecting the incoming and outgoing lines
All lines must be connected in accordance with the applicable standards and specifications and
tested with purge gas (pressure test and leak test). The specifications on dimensioning of the
connections are described in the "Design" chapter.
1. Connect the process gas input of the pressure regulator to the gas source or the process
gas line. Do not use an adapter between the gas source valve and the cylinder or bundle
connection of the pressure regulator!
Observe the identification of the inputs (IN) and outputs (out) or the arrow for the flow direc-
tion.
2. Connect the process gas output of the pressure regulator to the process.
3. Connect the waste gas outlet of the pressure regulator to the waste gas lines, if necessary.
5.3 Checking the armature
Check all connections for leakage.