![Spectron BE56-2U Скачать руководство пользователя страница 19](http://html.mh-extra.com/html/spectron/be56-2u/be56-2u_user-manual_1344153019.webp)
Spectron Gas Control Systems GmbH
Installation | 5
GES_BE56-2U_0720
19
4. Close valve PGI.
5. Disassemble the leak test device and connect the exhaust gas line to valve HPV.
6. Relieve the pressure regulator.
7. Close all valves.
The system should now be filled with inert gas (approx. 1 bar overpressure) up to the consumer.