10
Product to tank.
Route the product water into the top of the tank, or a tee in the
water tank fill hose.
DO NOT!
feed into a vent line, a manifold or the bottom of the
tank. Make sure that there is no restriction in this piping.
Product Water Plumbing
Salinity Probe
Automatic Valve
Product water tubing is 1/4”(6mm) on the Ventura 150 models.
See the Parker tube fitting as-
sembly diagram next page
.
Product water is pre-plumbed from the membrane into the electric
diversion valve. The diversion valve will reject product water into the overboard brine stream
until good quality is measured by the MPC-5000 control. Product water is then diverted into the
fresh water tank.
Product Diversion Valve Manifold
RotoFlow Meter
Accepted Product
Water Outlet
Check Valve
Rejected product outlet
Product from membrane