52
Operation
During normal operation the Red LED should be on . Power needs to be supplied to the Z-
Brane unit at all times that you wish to have the biofouling and scale protection. We recom-
mend that your watermaker be flushed after each use not only to protect the membrane but to
prevent corrosion in the feed water system. To achieve full effectiveness thoroughly fresh
water flush the watermaker several times before leaving the vessel.
The Z-Brane may be de-powered if the system is stored with chemicals or winterized with
Glycol.
DO NOT DISCONNECT
OR SPLICE ANY OF THE
HIGH VOLTAGE WIRING!
Contact the factory if
modifications are required.
Power on LED
High Voltage
connector