20
Spectra 10K Library Preventative Maintenance Guide
8.
Select
Display DSP Table
to review the test results.
Pay close attention to the Test Status Column—the first column on the left.
◗
The first four rows should be ignored.
◗
All other values in this column should be either
0
or
2
.
Note:
If any number in the first column (after the first four rows) is either
a
1
or a
3
, contact Spectra Logic Technical Support at (800) 227-4637
or (303) 449-0160, or send an e-mail to [email protected].
9.
Touch anywhere in the screen to exit the DSP trace window.
10.
Select the
Exit
icon and then select
Reset
to return the unit to a known condition.
11.
Remove the scratch tapes from the library.
12.
Use your backup software to re-insert your data tapes into the library.
13.
Verify that all drives respond to server commands and that the library boots up
correctly.
Test Status Column
Error Code Buffer Column